20-1520-01 & 75-2030 Connection
7. Connect the DB9 connectors of the 20-1520-01 and 75-2030 cables together.
8. RJ45 Connector end of the 20-1520-01 to the FSC3000 RS-232 Port 1.
9. USB connector of the 75-2030 adapter to one of the USB ports on the Vantron?Edge board.
TIP:
To add strain relief to this assembly, you can use a cable tie through the cable clamp on
the left side of the FSC3000 board and around the assembly connectors as a support.
Ethernet Connections
10. External Ethernet connection from an office router Ethernet port to the 5-Port Router Ethernet In port
(marked,
From Server
).
11. 6" RJ45 Patch Cable (FMS P/N 12-3031) from an open port of the 5-Port Router to the Ethernet In of
the Vantron/Edge board (marked
LAN 2
adjacent to the Power input of the Vantron/Edge board).
Install the Vantron/Edge - 5-Port Ethernet Switch Assembly
l
Remove the two nuts from the threaded posts on the left side of the FSC plate.
l
Align the holes of the assembly bracket over the threaded posts.
l
Put the two (2) 50-0008 8-32 KEPS Nuts on the threaded posts and tighten them.
Doc. No.: M1010 Rev.: 10
Page 78 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......