All conduits in the pedestal should terminate into a seal-off. The seal must be the first fitting where the
conduit emerges from grade. Install 1/2” (1.3 cm) or 3/4” (1.9) rigid steel conduits, as applicable, to the area
where the pedestal is to be located:
l
To the PV200 power source.
l
To other PV200 terminals or external Fuel Site Controller (FSC) junction box for Petro-Net
communications.
l
To the remote communication access panel for phone line(s), Ethernet.
l
To each mechanical pump or dispenser for control and pulser wires (for pedestal mounted PCMs only).
l
To each electronic dispenser for communication wires (for an internal FSC with a DPC board installed
in the pedestal only).
INFORMATION:
For information about Pump Control Module (PCM) installation and wiring,
see
M00-20-0340 Pump Control Module Installation, Operation and Maintenance Manual
.
4.1.1 Petro-Net Wiring
The PV200, PCMs, FSC and other devices communicate using an RS-485 protocol called Petro-Net
™
.
Petro-Net wiring is a twisted-pair of 18 AWG wires that must be twisted together to provide immunity to
electrical noise. You can order Petro-Net from OPW as Part #: 12-1029.
Petro-Net wiring can run a maximum of 5,000' (1,524 m).
Doc. No.: M1010 Rev.: 10
Page 23 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......