2. Mark the four (4) most applicable locations for the anchor bolts. There are eight (8) bolt holes (see the
illustrations above).
3. Drill the holes.
4. Anchor the pedestal with 3/8” anchor bolts.
IMPORTANT:
Use a type of anchor bolt that is appropriate for the material in which you will
anchor the pedestal (e.g. concrete).
5. Use the provided hardware to attach the enclosure to the pedestal. Align the provided gasket with the
mounting holes of the pedestal top plate. Carefully position the enclosure in place so that the open
installation holes are aligned with the installation holes of the pedestal (see the illustration above). Put
the four (4) bolts through the holes and tighten them using the provided washers and nuts.
Doc. No.: M1010 Rev.: 10
Page 19 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......