Section 10 PV200 Terminal Setup
The PV200 Terminal uses an intuitive user interface for easy setup.
A DIP-Switch block in the top left corner of the controller board is used to open the Terminal Setup screen.
l
Move switch #1 to the
ON
position to gain access to the Terminal Setup Main Menu.
l
Push
Reset
.
IMPORTANT:
The unit will not operate if Switch #1 and Switch #8 are both in the ON position.
Switch #8 is used to put the screen in Test Mode. Make sure all switches are in the OFF
position before you move Switch #1 to open the Terminal Setup screen.
10.1 Screen Controls
Doc. No.: M1010 Rev.: 10
Page 40 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......