Inbound/Outbound Connection: FSC3000 and IP Gateway (Optional)
NOTE:
The colors of the cables in the illustration are used to show the routing of the wires
only.
NOTE:
In this scenario, Inbound and Outbound connections are made between the 20-6000
IP Gateway and the FSC3000. The Ethernet connection must come from an external hard-
wired connection.
IMPORTANT:
Refer to "Integrated FSC Communication Conduit" on page 26 for information
on the routing of an Ethernet cable to the terminal through a dedicated conduit. You must obey
the National Electric Code and all national, state and local codes (refer to"Conduit/Wiring
Requirements" on page 1).
You must have two (2) 20-1517-01 DB25 to RJ45 Serial cables for this connection. These cables are
supplied with the 20-6013 kit.
1. P/N 20-1517-01 (first cable):
l
Connect the DB25 end of one of the 20-1517-01 cables to the POS Serial Port 1 of the IP Gateway.
l
Connect the RJ45 end of the cable to the FSC3000 RS232 Port #5.
INFORMATION:
The illustration above shows the ports as they are seen from the top of
the FSC3000. Port 5 is the one on the right of the front row of RS-232 ports.
2. P/N 20-1517-01 (second cable):
l
Connect the DB25 end of one of the 20-1517-01 cables to the POS Serial Port 2 of the IP Gateway.
l
Connect the RJ45 end of the cable to the FSC3000 RS232 Port #1.
INFORMATION:
The illustration above shows the ports as they are seen from the top of
the FSC3000. Port 1 is the one on the right of the back row of RS-232 ports.
3. Connect the external Ethernet cable to the Ethernet port of the IP Gateway. Connect the opposite end
to your Access Point/Router (where you distribute Internet to your devices).
4. Power Cable (supplied):
l
Connect the barrel end plug of the cable to the Power jack of the IP Gateway. Push the end into the
socket and turn 90° clockwise to lock the plug.
l
Connect the white Molex Terminal end to an open connector on the PetroNet Power Hub Board (J6
/ J7 / J8).
Doc. No.: M1010 Rev.: 10
Page 86 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......