OPW Fuel Management System’s fuel control systems are listed for use in a non-classified area. All of the
equipment must be installed outside of the hazardous areas.
NOTE:
Local codes can dictate specific installation requirements. Installation is subject to
approval by the local authority that has jurisdiction at the site.
1.4.2 Installation Requirement
OPW Terminals are designed to be installed above the hazardous area when using the terminal’s associated
pedestal.
The pedestal can be mounted in the hazardous area but a seal-off must be the first fitting for all conduits that
go into the area.
IMPORTANT:
All unused knockout holes that have been removed must be sealed.
For more information on conduit and seal-off installation for PV200 see
.
Figure 1-1 Dispenser Installations
Doc. No.: M1010 Rev.: 10
Page 11 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......