Section 5 Complete the Installation
When the pedestal, terminal, conduit and wiring installations are done, you can complete the installation.
NOTICE:
Do a check of the wiring before you apply power to the system components. Line (L)
voltage applied to low-voltage inputs will damage the system.
If you have an internal FSC installed in your terminal, remove the yellow paper safety strip from the SIMM
battery. If the system must be cold-started, put a piece of paper or business card into the battery clip. A cold-
start will clear all configuration settings except for transactions.
Install the pedestal door.
1. Put the two (2) holes in the bottom of the door over the door pins in the front of the pedestal base.
2. Move the top of the door into position as shown in the illustration.
3. Use the two (2) supplied hex bolts to assemble the door to the terminal as shown in the illustration.
Make sure that the bolts are tight.
You can now energize the system.
Doc. No.: M1010 Rev.: 10
Page 28 of 98
Содержание Petro Vend 200 M1010
Страница 16: ...Typical System Diagram with an Integrated FSC Electronic Pump Control Doc No M1010 Rev 10 Page 16 of 98...
Страница 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Страница 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Страница 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Страница 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Страница 85: ...FSC3000 Internal Connections Inbound Outbound with IP Gateway Only Doc No M1010 Rev 10 Page 85 of 98...
Страница 96: ...Web links updated 2 13 2019 to new www opwglobal opw fms site Doc No M1010 Rev 10 Page 96 of 98...
Страница 98: ......