3-3-1 Memory Bank Structure
Each control point has eight memory banks numbered from 0 through 7. When
you change the current memory bank, all the settings affected by the memory
bank are changed to those contained in the newly designated bank. The struc-
ture of E5ZD parameters is shown below for the E5ZD-8
jjj
-E or
E5ZD-8H
jj
M-E to illustrate this. Although only the banks for two control points
are shown, all control points have eight banks.
E5ZD Parameters
Parameters independent of control points
Control point for heater burnout detection
Output operation (normal or inverted)
Parameters for point 0
Parameters indepen-
dent of memory banks
Current memory bank
Mode for alarm 1
Mode for alarm 2
Heater detection level
Memory bank 7
Parameters for point 7
Temperature setting
Input shift
Hysteresis
Proportional band
Integral time
Derivative time
Control period
Fuzzy strength*
Fuzzy scale 1*
Fuzzy scale 2*
Setting for alarm 1
Setting for alarm 2
Memory bank 2
Memory bank 1
Memory bank 0
Memory bank 7
Temperature setting
Input shift
Hysteresis
Proportional band
Integral time
Derivative time
Control period
Fuzzy strength*
Fuzzy scale 1*
Fuzzy scale 2*
Setting for alarm 1
Setting for alarm 2
Memory bank 2
Memory bank 1
Memory bank 0
Parameters indepen-
dent of memory banks
Current memory bank
Mode for alarm 1
Mode for alarm 2
Heater detection level
*For Fuzzy-logic Controllers only.
3-3-2 Memory Bank Designations
When operating the E5ZD, the desired memory bank must be designated ac-
cording to input terminal status or according to commands transferred from the
host computer. Although either method may be used, designation via input ter-
minal status does not allow you to designate a different bank for each control
point, as is possible from the host computer, i.e., the same memory bank number
is designated for all control points. Note that this does not mean that the same
Memory Banks
Section 3-3
Содержание E5ZD
Страница 1: ...Cat No Z042 E1 4 Multipoint Temperature Controller E5ZD ...
Страница 2: ......
Страница 3: ...E5ZD Multipoint Temperature Controller Operation Manual Revised November 1996 ...
Страница 4: ...iv ...
Страница 6: ...vi ...
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 76: ......
Страница 128: ......
Страница 132: ......
Страница 142: ......
Страница 146: ......
Страница 148: ......
Страница 150: ......
Страница 154: ......
Страница 157: ...Cat No Z042 E1 4 E5ZD Multipoint Temperature Controller OPERATION MANUAL ...