OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
55
SGSM
Starting the Test
Use of this equipment in a manner not specified by the manufacturer
may impair the protections provided by the equipment.
The following steps are to be done once the cell has been prepared and
installed properly:
1. Put the “MODE” switch to the “SGSM” position.
2.
In the software, fill out the test information required for the test.
3.
Select a temperature profile for the test (see page 14).
4. Make sure the Pressure Release valve is completely closed (clockwise).
5. Set the “PRESSURE UP” switch to the “MANUAL” or “AUTO” position
depending on the user’s test preference.
6. Set the “COOL” switch to the “MANUAL” or “AUTO” position depending
on the user’s test preference.
7. Turn the “HEAT” switch on.
8. Verify that all of the switches on the control panel are in the proper
positions for the test and click the “START TEST” button in the software.
Edit information about the test or continue with the test procedure by
pressing “OK”. See page 42.