OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
32
UCA
Stopping the Test
1. When the test is complete, click the “STOP TEST” button in the software.
The data file will be automatically saved in the folder specified on the
“Setup” screen.
2. Turn the “HEATER” switch to the "OFF" position. If the cooling system is
switched to the “Auto” position, the cooling system will cool automatically
if the cell temperature is greater than 100°F. To change the temperature
threshold, contact OFITE Technical support.
3. Turn the “COOL” switch to the “MANUAL” position and allow the test cell
to cool to 100°F.
4. When the cell has cooled, turn the “PRESSURE UP” and “COOL”
switches to the "OFF" position. Turn the “WATER ON/FILL” switch to the
“OFF” position.
5. Open the pressure release valve by
slowly
turning it counterclockwise.
Always open the pressure release valve very slowly to prevent
pulling cement into the plumbing.