Chapter 25 — Fault locating and clearing
Page 449 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
You can activate an initialization by pressing the manual initialize (Man Int)
button on the NTMW01 SSC card.
An initialization occurs automatically after the System Loader program runs,
when a software or firmware fault is detected, and when a common
equipment hardware fault is detected.
Midnight and Background Routines
In the Configuration Record (LD 17), you can select the nonresident software
programs which will run in the Midnight Routine and Background Routine.
These routines automatically perform maintenance checks. Programs
included in the Midnight Routine are defined with the prompt DROL (derived
from “daily routine overlay”). Programs included in the Background Routine
are defined with the prompt BKGD.
The Midnight Routine runs once every 24 hours. This routine is preset to run
at midnight when a system is shipped, but you may assign a different time in
the Configuration Record. When it is time for the Midnight Routine to start,
the system cancels any other program.
The Background Routine runs when no other program is loaded in the overlay
area. The programs included in the Background Routine run in sequence
repeatedly until there is another request to use the overlay area (for example,
if you log on to check the status of a circuit card) or the Midnight Routine
runs.
You may include the programs listed in
in Midnight and
Background Routines. Software Audit (LD 44), and Network and Signaling
Diagnostic (LD 30) should always be used in the Background Routine.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...