Chapter 20 — Meridian Mail Compact Option installation and maintenance
Page 253 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Starting Point: Meridian Mail System Status and Maintenance Menu.
Step
Action
1
Select the “System Status” screen and perform a courtesy-down
procedure before starting on any of the following steps.
Note:
Do this prior to starting any of the procedures described in this guide to
prevent calls from being abruptly terminated when the operation begins. For
more information, refer to the section “Disabling/Activating the system” in the
chapter “System Status and Maintenance” in the
System Administration Guide.
2
Insert the Meridian Mail Compact Option Install/data tape into the tape
drive.
Note:
in this guide for tape insertion instructions.
3
Press the reset button on the Meridian Mail Compact Option card.
Result Diagnostic routines are shown followed by a pause of
approximately five minutes while the tape is automatically retensioned.
4
When retensioning begins, the following message is displayed.
Tape retension
Note:
Tape retension takes about 5 minutes, and it takes between 5 and 10
minutes to load the software.
Result Once loaded, the System Installation and Modification Menu is
displayed.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...