Chapter 20 — Meridian Mail Compact Option installation and maintenance
Page 217 of 536
Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
Installing a printer
Connecting a printer to the system administrator’s terminal allows the
administrator to print reports using Meridian Mail Compact Option’s
Operational Measurements function.
You can also configure Meridian Mail Compact Option to print System Error
and Event Reports (SEERs) on the same printer as they are generated. Refer
to the Meridian Mail Compact Option System Administration Guide (NTP
555-7001-333) for more information.
SEERs contain information about every system event and error that occurs on
the Meridian Mail Compact Option system. For more information on the
content of SEERs, refer to Maintenance Messages (SEERs) Reference
Manual (NTP 555-7001-510).
Meridian Mail Compact Option supports the printer: the LA75 Plus
Companion Printer. If the printer you are installing is a different model,
match its settings with those described in
, and
, and use the setup procedures described in the printer’s
owner’s manual.
Procedure 45
Connecting and configuring the LA75 Plus Companion printer
1
Connect the printer to the appropriate port at the rear of the system
administrator’s terminal using the following cables:
For VT220 terminals Connect the printer to the H87575-A adapter
using a BC16E-10 cable, and connect the adapter to the port labeled
“PR” using an A0369499 cable.
For VT320, VT420, and VT520 terminals Connect the printer to the
port labeled “Printer Port” using a BC16E-10 cable.
For NT220 terminals Connect the printer to the H87575-A adapter
using a BC16E-10 cable, and connect the adapter to the port labeled
“Auxiliary” using an NTND82AA/AB cable.
For HP700/22 terminals Connect the printer to the port labeled
“Printer” using an A0369499 cable.
For HP700/32 terminals Connect the printer to the H87575-A
adapter using a BC16E-10 cable, and connect the adapter to the port
labeled “Port 2” using an A0369499 cable.
Содержание Meridian Meridian 1
Страница 3: ...553 3121 210 Standard 3 0 January 1999 ...
Страница 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Страница 89: ...Page 70 of 536 Chapter 6 Bracing cabinets against earthquakes 553 3121 210 Standard 3 0 January 1999 ...
Страница 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Страница 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Страница 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Страница 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Страница 139: ...Page 120 of 536 Chapter 13 Installing the circuit cards 553 3121 210 Standard 3 0 January 1999 ...
Страница 157: ...Page 138 of 536 Chapter 15 Installing and connecting SDI and Ethernet ports 553 3121 210 Standard 3 0 January 1999 ...
Страница 175: ...Page 156 of 536 Chapter 16 Starting up and testing the system 553 3121 210 Standard 3 0 January 1999 ...
Страница 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Страница 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Страница 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 455: ...Page 436 of 536 Chapter 24 Changing pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Страница 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...