Setting Up Your Server 3-15
5.
Hold the handle and pull out the server from the rack slowly and carefully.
The server clicks to be latched.
6.
Pull out the server from the rack with the right and left release lever pressed to release the
latch.
IMPORTANT:
Pull out the server slowly holding the bottom of the server by at
least two persons.
Do not apply any load on the server pulled out from the rack.
Doing so may cause personal injury if the server drops.
To remove some mechanical parts of the rack, see the installation procedure.
Release lever
Captive thumb screws
Handles
Содержание Express5800/120Rh-2
Страница 142: ...4 46 Configuring Your Server This page is intentionally left blank ...
Страница 236: ...7 12 Maintenance This page is intentionally left blank ...
Страница 320: ...9 46 Upgrading Your Server Pin Red Pin Red N8103 80F N8103 81F ...
Страница 336: ...9 62 Upgrading Your Server This page is intentionally left blank ...
Страница 338: ...A 2 Specifications This page is intentionally left blank ...
Страница 346: ...C 2 IRQ This page is intentionally left blank ...
Страница 406: ...G 4 Product Configuration Record Table This page is intentionally left blank ...