6. System Diagnostic Tool
Scalable Modular Server DX2000 Maintenance Guide
34
Chapter 1 Maintenance
Important TeDoLi startup request may be cancelled when BIOS setup is reset due to the
change of settings. If Type of CPU Board is not"TeDoLi", shut down the
server and run the TeDoLi startup command again. Check that the shutdown
process is complete by using the "list" command.
MNG PC> shutdown -f all
MNG PC> list
MNG PC> start tedoli all
The server module TeDoLi terminates in about 8 minutes from the start of execution. Enter “list” again
and check that Status of server modules is PASS.
TP (Diagnosis program) of CSC modules is infinitely executed out of synchronization with TeDoLi.
Enter “stop 0” to stop it.
4.
If you find “Fail” in Status in step 3, specify the module with ‘ list ”server module number” ’ and check
the detail.
(Example: When you find the server module 23 to be Fail, enter “list 23”.)
MNG PC> list
Module List Power Type Status
+----------------+----------+----------+----------+
CSC ON TP Run
CPU Board1 ON MNG PC
CPU Board2 ON TeDoLi PASS
CPU Board3 ON TeDoLi PASS
:
CPU Board43 ON TeDoLi PASS
CPU Board44 ON TeDoLi PASS
+----------------+----------+----------+----------+
CSC : 1 CPU : 43 + MNG PC
PASS: 0 PASS: 43
FAIL: 0 FAIL: 0
MNG PC>
MNG PC> stop 0
MNG PC>
MNG PC> shutdown -f all
MNG PC> list
MNG PC> start tedoli all
Содержание DX2000
Страница 131: ... MEMO ...