RP0290-2000
8
NACE International
6.6.1 Description of concrete structure and impressed
current cathodic protection system.
6.6.2 As-built drawings of cathodic protection system.
6.6.3 Periodic inspection requirements.
6.6.4 System output parameters.
6.6.5 Rectifier maintenance requirements.
6.6.6 System physical maintenance requirements.
6.6.7 Spare parts list.
6.6.8 System reporting records.
6.6.9 Required test procedures.
6.7 A training program should be provided for the
owner/operator and should include the necessary
information and data required for system operation.
6.7.1 System operation training shall include the
following:
6.7.1.1 Adjustment and operation of the rectifier
and components.
6.7.1.2 Adjustment of other related components of
the cathodic protection system.
6.7.1.3 Evaluation of electrical continuity bonds
and effectiveness of electrical isolation.
6.7.1.4 Proper use of other associated
components, including reference electrodes and
test coupons.
6.7.1.5 Reinforcement and permanent reference
electrode potential measurements.
6.7.1.6 Current and voltage measurements.
_______________________________________________________________________
Section 7: Records
7.1 Records of the cathodic protection system shall be
maintained. This provides reference to previously obtained
data in the event that changes occur, troubleshooting is
required, or modifications or additions are made to the
system. These records should include all the physical,
design, and test data accumulated on the installation.
7.2 The following information, if collected during the design
survey, should be made an integral part of the record.
7.2.1 Results of chloride in concrete tests and other
chemical and physical analyses.
7.2.2 Delamination survey data.
7.2.3 Depth-of-cover data.
7.2.4 Reinforcement and permanent reference
electrode potential data.
7.2.5 Electrical continuity and electrical isolating data.
7.2.6 Current requirement data.
7.3 During installation of the impressed current cathodic
protection system, certain tests should be performed to
ensure a quality installation. The following data should be
part of the records:
7.3.1 Electrical continuity verification.
7.3.2 Tests for electrical shorts.
7.3.3 Tests for electrical isolation.
7.4 The following additional information, if available, shall
be included in the permanent records of the impressed
current cathodic protection system:
7.4.1 Tests conducted to determine that all
components are in working order prior to permanent
energizing.
7.4.2 Reinforcement potential data at representative
locations prior to energizing the system.
7.4.3 Reinforcement potential data at representative
locations after energizing the system.
7.4.4 Criterion compliance data.
7.4.5 Final rectifier data including voltage and current
outputs, mode of control including limits, rectifier serial
number, and AC and DC capacity.
7.4.6 Current density and distribution data.
7.5 Detailed as-built drawings and data should be
incorporated into the permanent records.
7.6 The operation and maintenance manual shall become
a part of the permanent records for the system.
Содержание CP 1
Страница 1: ...CP 1 Cathodic Protection Tester Course Manual February 2005 NACE International 2000 ...
Страница 265: ......
Страница 266: ......
Страница 267: ......
Страница 268: ......
Страница 301: ...RP0169 2002 32 NACE International ISBN 1 57590 035 1 ...
Страница 535: ...TM0101 2001 24 NACE International ISBN 1 57590 137 4 ...