Installing C.P. Components
8:26
CP 1 – Cathodic Protection Tester Course Manual
©
NACE International, 2000
07/01/04
Anode
Pipeline
Surface
Storage Tank
+
_
Power
Source
Figure 8.22 Surface Distributed Anode Groundbed Configuration
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
{
R
a
m
p
Berths
Shore Line
{
Piles
Anodes
Rectifiers
Figure 8.23 Distributed Anode Groundbed Protecting Wharf Piling
Deep Anode Groundbed Configuration
Deep anode installati
ons
are those where the anodes are installed in the
bottom of a drilled hole. The general layout is shown in Figure 8.24.
The installation is begun by drilling a hole of the specified depth and
diameter. An electrical log is frequently made of the hole to determine areas
of lowest resistivity. This is done by measuring the resistance between a
metal bar or anode lowered down the hole and some low resistance ground.
The log helps to determine the desired locations for the anodes.
Содержание CP 1
Страница 1: ...CP 1 Cathodic Protection Tester Course Manual February 2005 NACE International 2000 ...
Страница 265: ......
Страница 266: ......
Страница 267: ......
Страница 268: ......
Страница 301: ...RP0169 2002 32 NACE International ISBN 1 57590 035 1 ...
Страница 535: ...TM0101 2001 24 NACE International ISBN 1 57590 137 4 ...