System Preparation 3-1
3
System Preparation
3.1
Move/Posit the System
Please read and understand the safety precautions before placing the system to ensure
safety for both operator and device.
1. Turn off the power and disconnect the system from all peripherals.
2. Carry the system by holding the handle.
3. Place the system in a desired location.
4. Leave at least 20cm at the back and both sides of the system.
CAUTION:
Maintain a generous–free air flowing space around the back
and both sides of the system; failure may result due to
increased rise in system operating temperature.
3.2
Power Supply
This system can work normally only when it is connected to the external power supply or
the battery capacity is sufficient.
3.2.1
Connecting the External Power Supply
1. Connect the connector of the power adapter to the adapter port in the system.
2. Use a three-wire cable to connect the adapter with the external power supply.
3. The external power supply system must meet the following requirements:
Power supply voltage:100-240V
~
Power supply frequency: 50/60Hz
Input current: 1.5- 0.6A
The model of the power adapter: ADP1210-01.
If you have any question about the power adapter, please contact your sales
representative.
NOTE:
1. You must use the specified power adapter.
2. Do not use this power adapter in the conditions other than those specified.
Содержание M5 Exp
Страница 1: ...M6 M6T M6 Exp M6s M6 Pro M55 M58 M5 Exp Diagnostic Ultrasound System Operator s Manual Basic Volume...
Страница 2: ......
Страница 12: ......
Страница 41: ...System Overview 2 11 UMT 200 UMT 300...
Страница 246: ...12 2 Probes and Biopsy V10 4B s CW5s 4CD4s P12 4s 7L4s L12 4s P7 3s L14 6Ns P4 2s CW2s...
Страница 286: ......
Страница 288: ......
Страница 336: ......
Страница 338: ......
Страница 357: ...P N 046 008768 00 V1 0...