ULN-R Installation Guide
510
Figure F.14: Phantom Supply Cable and Ch. 1-4 Connectors
8. Install the mic pre board, making sure that the pins on the bottom of the board line up with the
sockets highlighted in the picture above. You must install the channel 1-4 board in this position. Use
two Phillips head screws to secure the mic pre board and dab them with caulk. Fit the ribbon cable
jumper between the mic pre and DB25 connector board, making sure that the pins are lined up.
Figure F.15: Installing the Ch. 1-4 Mic Pre Board
9. If you are installing the channel 5-8 mic pre kit, install it in the sockets next to the channel 1-4 board,
making sure the pins are properly seated. Use four Phillips head screws to secure the mic pre board
Содержание 3d Upgrade Board Set
Страница 1: ...Metric Halo 3d Users Guide...
Страница 111: ...2882 Specifications 171...
Страница 183: ...Installation and Registration 183 Figure 9 7 Security Privacy Privacy tab Allow MIOConsole3d access to Microphone...
Страница 456: ...The DSP Toolchest 456 Parameters F 10 20k Sets the crossover frequency in Hz of the bandsplit...