MI 3325 MultiServicerXD
95
Measurement can be stopped manually or by timer.
Save results (optional).
Figure 6.40: Examples of Sub-leakage measurement results
Note:
When P/S probe is connected during the Sub-leakage measurement, then the current
through it is also considered.
6.2.8 Differential Leakage
Figure 6.41: Differential Leakage test menu
Test results / sub-results
Idiff
........... Differential Leakage current
P
............... Power
Test parameters
Duration
Duration
[Off, 2 s
… 180 s]
Change
Change status
[YES, NO]
YES: The instrument measures leakage current in two sequential
steps with delay* in between. The phase voltage is firstly
applied to the right live output of the mains test socket and
secondly to the left live output of the mains test socket.
NO: The phase voltage is applied only to the right live output of the
mains test socket.
Delay
*Delay time
[0.2 s … 5 s]
Test limits
H Limit(Idiff)
High Limit (Idiff) [Off, 0.25 mA
… 15.0 mA, Custom ]