![METREL MultiServicerXD MI 3325 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/metrel/multiservicerxd-mi-3325/multiservicerxd-mi-3325_instruction-manual_1779043024.webp)
MI 3325 MultiServicerXD
23
4.5.2 Measurement actions and messages
Conditions on the input terminals allow starting the measurement; consider
other displayed warnings and messages.
Conditions on the input terminals do not allow starting the measurement,
consider displayed warnings and messages.
Proceeds to next step of the measurement.
Stop the measurement.
Result(s) can be stored.
Starts test leads compensation in Rlow / Continuity P/S - PE measurement.
Starts Zref line impedance measurement at origin of electrical installation in
Voltage Drop measurement. Zref value is set to 0.00 Ω if pressing this touch
key while instrument is not connected to a voltage source.
Expands column in control panel.
The instrument is overheated. The measurement can’t be carried out until
the icon disappears. Press OK to continue.
The device under test should be switched on (to ensure that the complete
circuit is tested).
In case of simultaneously measuring of Riso, Riso-S or Isub, Isub-S. If the
voltage has dropped because of one measurement, the other measurement
is also compromised.
Measurement result Isub, Isub-S is scaled to 110 V.
Red dot indicates phase of measurement where higher leakage was
measured. Applicable only if phase reversal is enabled during the
measurement.
Test leads resistance in Rlow and Continuity P/S - PE measurement is not
compensated.
Test leads resistance in Rlow and Continuity P/S - PE measurement is
compensated.
Warning
!
A high voltage is / will be present on the instrument output! (Withstanding
test voltage, Insulation test voltage, or mains voltage).