Electrical Installation Safety Trainer
AD 1 - MI 3399
81
2.4.2.2 Exercise No. 2.4-2: RCD trip-out time, current and contact
voltage measurements in an IT earthing system
Measuring procedure
1
To measure the contact voltage
U
C
of a IT system select the
RCD U
C
test.
2
To measure the trip-out time
t
ΔN
of a IT system select the
RCD t
test.
3
To measure the trip-out current
I
Δ
of a IT system select the
RCD I
test.
4
To perform all RCD measurements (
U
C
,
t
ΔN
,
I
Δ
) in one easy step select the
RCD
Auto
test.
5
Set the RCD test parameters (I
dN
, current type, selectivity and contact voltage limit)
by clicking in the bottom left dark grey corner and selecting the appropriate RCD
settings.
In this case we use a 30mA RCD so in an IT earthing system which has water
in the proximity. That is why the contact voltage limit must be set to 25 V.
Содержание MI 3399
Страница 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Страница 28: ...Electrical Installation Safety Trainer AD 1 MI 3399 28 AD 1 MI 3399 EIS Electrical Installation Safety Trainer...
Страница 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Страница 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Страница 122: ...Power and Voltage Quality Trainer AD 2 MI 3399 122 AD 2 MI 3399 PQA Power and Voltage Quality Trainer...
Страница 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Страница 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Страница 205: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 205 AD 3 MI 3399 PAT Appliances Machines Safety Trainer...
Страница 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Страница 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...