PV Photovoltaic Systems Trainer
AD 4
– MI 3399
251
TABLE OF CONTENTS:
1
Introduction ...................................................................................................... 252
1.1
General Description .......................................................................................... 252
1.2
General warnings .............................................................................................. 252
1.3
Applied standards ............................................................................................. 253
1.4
Meaning of warning/information symbols on front panel .............................. 254
1.5
List of measurements that can be demonstrated ........................................... 254
2
Front panel description .................................................................................... 255
3
Measurements ................................................................................................. 257
3.1
Continuity of earthing system .......................................................................... 257
3.2
PV array insulation resistance ......................................................................... 258
3.3
Measurement of irradiation and temperature .................................................. 259
3.4
Uoc, Isc test and I/V characteristic measurement .......................................... 260
3.5
Automatic test sequence .................................................................................. 261
3.6
PV panel test ..................................................................................................... 262
3.7
Measurement of inverter input
– DC side ........................................................ 263
3.8
Measurement of inverter output
– AC side...................................................... 264
3.9
Inverter efficiency ............................................................................................. 265
4
Technical data ................................................................................................. 266
5
Maintenance .................................................................................................... 267
5.1
Cleaning ............................................................................................................. 267
5.2
Standard set ...................................................................................................... 267
Содержание MI 3399
Страница 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Страница 28: ...Electrical Installation Safety Trainer AD 1 MI 3399 28 AD 1 MI 3399 EIS Electrical Installation Safety Trainer...
Страница 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Страница 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Страница 122: ...Power and Voltage Quality Trainer AD 2 MI 3399 122 AD 2 MI 3399 PQA Power and Voltage Quality Trainer...
Страница 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Страница 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Страница 205: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 205 AD 3 MI 3399 PAT Appliances Machines Safety Trainer...
Страница 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Страница 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...