Power and Voltage Quality Trainer
AD 2
– MI 3399
182
status in the MEASRUEMENT SETUP
CONNECTION SETUP menu. If it's marked
with an OK sign ( ), you can start observing measurements.
4.7.1 Real time measurements
By entering the MEASRUREMENTS MENU, the user can observe measured
parameters in real time.
Figure 4-65: Measurement submenu
Figure 4-66: Real time measurements of phase diagram and unbalance
4.7.2 Recording unbalance measurements
Basic tool for Power Quality analysis is recording electrical system parameters. In this
step, we will create a record and observe it on the instrument, as this is a typical case
for troubleshooting.
From the Main menu, enter the Recorders window and then go to the General rec.
menu. Here, the user needs to set up all parameters as shown in the figure below:
Содержание MI 3399
Страница 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Страница 28: ...Electrical Installation Safety Trainer AD 1 MI 3399 28 AD 1 MI 3399 EIS Electrical Installation Safety Trainer...
Страница 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Страница 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Страница 122: ...Power and Voltage Quality Trainer AD 2 MI 3399 122 AD 2 MI 3399 PQA Power and Voltage Quality Trainer...
Страница 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Страница 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Страница 205: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 205 AD 3 MI 3399 PAT Appliances Machines Safety Trainer...
Страница 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Страница 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...