Power and Voltage Quality Trainer
AD 2
– MI 3399
150
Figure 4-11: Waveform record screen
Now go to RECORDERS
GENERAL REC and setup the general recorder with the
following parameters:
Interval:
10 sec
– recording interval is set to 10 seconds
Include events:
On
(with waveforms)
– this option allow us to record waveform
shape for each event
Include alarms:
Off
– no alarms will be triggered
Start time: Manual
Duration:
1
days
– recording will stop after 24 hours
Figure 4-12: General recorder setup
The instrument is now prepared for voltage event recording, which is generated by the
Application Trainer. Please start the recorder by pressing the
F1 (“START”) key. The
recorder can be stopped anytime, by pressing the F1 (STOP) key.
4.2.2 Observing dips on the instrument
Enter the RECORDERS
EVENTS TABLE menu and check recorded events. The
events table should be similar as shown in the figure below.
Содержание MI 3399
Страница 27: ...Electrical Installation Safety Trainer AD 1 MI 3399 27...
Страница 28: ...Electrical Installation Safety Trainer AD 1 MI 3399 28 AD 1 MI 3399 EIS Electrical Installation Safety Trainer...
Страница 46: ...Electrical Installation Safety Trainer AD 1 MI 3399 46 3 Exit settings...
Страница 74: ...Electrical Installation Safety Trainer AD 1 MI 3399 74...
Страница 122: ...Power and Voltage Quality Trainer AD 2 MI 3399 122 AD 2 MI 3399 PQA Power and Voltage Quality Trainer...
Страница 197: ...Power and Voltage Quality Trainer AD 2 MI 3399 197 Figure 4 89 Transient Chart view...
Страница 204: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 204...
Страница 205: ...PAT Appliances Machines Safety Trainer AD 3 MI 3399 205 AD 3 MI 3399 PAT Appliances Machines Safety Trainer...
Страница 249: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 249...
Страница 250: ...PV Photovoltaic Systems Trainer AD 4 MI 3399 250 AD 4 MI 3399 PV Photovoltaic Systems Trainer...