
Ring Setup and Testing: Integration Procedures
Final Operations
...........................................................................................................................................................................................................................................................
8 - 2 3
365-372-334 R2.0
Issue 4, November 2004
............................................................................................................................................................................................................................................................
Final Operations
Description
The following procedure ensures that all test signals and cross-connects
have been removed and the Metropolis
®
DMXplore shelf is alarm free
and ready for network connection procedures.
Procedure
Step 1
Use the scroll bar in the
Command Builder
window to scroll down to
and Select the
upd-sys
command.
...........................................................................................................................................................................
Step 2
Click
Send
to issue the command.
Result:
The Response Window should display the command
followed by a
COMPLD
indication.
...........................................................................................................................................................................
Step 3
Verify that no alarm LEDs are lit and no
FAULT
LED is lit on any
circuit pack.
Important!
Sending an upd-sys command will update the system
database to reflect the current configuration and incoming signals.
...........................................................................................................................................................................
Step 4
If any alarms are present, refer to 365-372-333, Metropolis
®
DMXplore
Access Multiplexer, Alarm Messages and Trouble Clearing Guide.
Clear PM Registers
The following steps will clear all the performance monitoring registers:
Step 1
Use the scroll bar in the
Command Builder
window to scroll down to
the
init-reg-all
command.
...........................................................................................................................................................................
Step 2
Click on the
init-reg-all
command. Select all from the
<DEFAULTAID> and double click on the 15-min under the
<TMPERINIT> column and select all.
Содержание Metropolis DMXplore
Страница 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Страница 224: ... Metropolis DMXplore Access Multiplexer Ring Setup and Testing P A R T x x 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 258: ... Laser Safety and Classifications Metropolis DMXplore Optical Specifications A 8 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 270: ... Fiber Cleaning Cleaning Inspecting Optical Connectors B 1 2 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...