
...........................................................................................................................................................................................................................................................
Installation Tests
LBO Software Settings
6 - 4
365-372-334 R2.0
Issue 4, November 2004
............................................................................................................................................................................................................................................................
LBO Software Settings
Description
This section provides instructions for setting the software Line Build
Out (LBO) for the DS1 cabling and requires that the SYSCTL and
main circuit packs be installed and that software has been downloaded.
...........................................................................................................................................................................
Setting LBO Values
Follow this procedure to set the LBOs for DS1 and DS3 interfaces.
Step 1
Log on to the Metropolis
®
DMXplore shelf using the CIT software as
described in the .
...........................................................................................................................................................................
Step 2
Refer to the following table of cable lengths and LBO values.
Determine the LBO value corresponding to the DS1 cables installed.
...........................................................................................................................................................................
Step 3
Use the scroll bar in the
Command Builder
window to scroll down to
the
ent-t1(sb)
command.
...........................................................................................................................................................................
Step 4
Click on the
ent-t1(sb)
command.
...........................................................................................................................................................................
Step 5
Under the
Parameters
section,
<T1AID>,
click on
{a}-{1}-{1}.
LBO Value
Distance (feet)
Cable Type 1161A
20
0 - 133 (default)
40
133 - 267
60
267 - 420
80
420 - 533
100
533 - 655
Содержание Metropolis DMXplore
Страница 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Страница 224: ... Metropolis DMXplore Access Multiplexer Ring Setup and Testing P A R T x x 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 258: ... Laser Safety and Classifications Metropolis DMXplore Optical Specifications A 8 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 270: ... Fiber Cleaning Cleaning Inspecting Optical Connectors B 1 2 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...