
...........................................................................................................................................................................................................................................................
Installation Tests
Local Equipment and Cross-connect Tests
6 - 1 2
365-372-334 R2.0
Issue 4, November 2004
...........................................................................................................................................................................
Step 8
Verify that an alarm is present on the port that the test set connections
have been removed from. Use the rtrv-alm-all command in the
Command Builder window.
...........................................................................................................................................................................
Step 9
Repeat entire procedure on each of the remaining DS1 tributaries of
function group B.
...........................................................................................................................................................................
Step 10
Use the scroll bar in the
Command Builder
window to scroll down to
the
upd-sys
command.
...........................................................................................................................................................................
Step 11
Click on the
upd-sys
command.
...........................................................................................................................................................................
Step 12
Click
Send
to issue the command.
Result:
This command will remove alarms generated by removing
the test signals from the DSX-1.
...........................................................................................................................................................................
Step 13
Check off the appropriate box in Appendix E, Installation Checklist.
End of Steps
DS3 Testing Procedure
Perform the following steps to verify backplane cabling to B-Group
function slot of the access panel.
Cabling to DS3 connectors located on the access panel are via
backplane connections. If a VLNC5 (OC3/16DS1/2DS3) or VLNC25
(OC12/16DS1/2DS3) main pack is installed, DS3 cabling will need to
be tested.
Important!
This procedure requires the use of a DS3 test set.
Step 1
Set the DS3 test set to transmit and receive a valid signal.
...........................................................................................................................................................................
Step 2
Connect an input and output cable from the DS3 test set to the
associated input and output of the DS3 port on the access panel.
Содержание Metropolis DMXplore
Страница 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Страница 224: ... Metropolis DMXplore Access Multiplexer Ring Setup and Testing P A R T x x 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 258: ... Laser Safety and Classifications Metropolis DMXplore Optical Specifications A 8 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 270: ... Fiber Cleaning Cleaning Inspecting Optical Connectors B 1 2 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Страница 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...