64
ZENIT
SHIFT CALENDAR
Shift Calendar
The shifts are recorded with the shift calendar. It is possible to record, print or not to record the production and clas-
sification data of the shift.
Example
Monday
Begin 1 06.00 / Acquire
Begin 2 14.00 / Idle
Data of shift 1 are recorded
Begin 3 22.00 / Acquire Data of shift 2 are not recorded (Data are not saved)
Tuesday
Begin 1 06.00 / Print
Data of shift 3 (Monday) are recorded
Begin 2 14.00 / Idle
Data of shift 1 are printed
etc.
Содержание YarnMaster Zenit
Страница 1: ...YARNMASTER ZENIT Instruction Manual LZE 044843 003en...
Страница 2: ......
Страница 4: ......
Страница 82: ...w...