Installation Warnings
Have a qualified engineer connect the power cord to the switchboard.
Protective circuits inside the instrument, including input fuses, are connected to match
the input terminal polarity. Make sure the colors of the wires connected to the input
terminals (L, N, and GND) are correct.
Verify that all safety precautions are taken. Make all connections to the unit before
applying power. Note the instrument's external markings described under "Safety
Symbols."
You cannot use standard rack mounting support rails, as they would block the airflow
needed for cooling.
Heavy Weight
Danger to hands and feet. To avoid personal injury and damage to the instrument, always
use a sturdy cart or other suitable device to move the instrument. Do not lift the
instrument alone; always use two people to lift the instrument.
Keysight AC6800B Series Operating and Service Guide
9
Safety and Regulatory Information
Содержание AC6801B
Страница 1: ...Operating and Service Guide Keysight AC6800B Series Basic AC Sources...
Страница 16: ...AC6802B 1 Getting Started 16 Keysight AC6800B Series Operating and Service Guide...
Страница 17: ...AC6803B Keysight AC6800B Series Operating and Service Guide 17 1 Getting Started...
Страница 18: ...AC6804B 1 Getting Started 18 Keysight AC6800B Series Operating and Service Guide...
Страница 62: ......
Страница 196: ...4 Calibration Verification and Service 196 Keysight AC6800B Series Operating and Service Guide...