1.
Check that the power switch is turned off.
2.
Remove the terminal cover attached to the OUTPUT terminal block.
3.
Securely connect the load wires to the OUTPUT terminal block. The length of the load cables should
be less than 30 meters. If the load has a ground (GND) terminal, be sure to connect it to the G terminal
of the instrument's OUTPUT terminal block. Be sure to use a wire that is greater than or equal to the
diameter of the wires used to connect the load.
4.
Attach the terminal cover that you removed above using the lower holes.
The L and N terminals of the OUTPUT terminal block are isolated from the AC power line,
and the polarity does not constitute a problem in terms of safety. Grounding can be fur-
nished using L or N.
Keysight AC6800B Series Operating and Service Guide
53
1 Getting Started
Содержание AC6801B
Страница 1: ...Operating and Service Guide Keysight AC6800B Series Basic AC Sources...
Страница 16: ...AC6802B 1 Getting Started 16 Keysight AC6800B Series Operating and Service Guide...
Страница 17: ...AC6803B Keysight AC6800B Series Operating and Service Guide 17 1 Getting Started...
Страница 18: ...AC6804B 1 Getting Started 18 Keysight AC6800B Series Operating and Service Guide...
Страница 62: ......
Страница 196: ...4 Calibration Verification and Service 196 Keysight AC6800B Series Operating and Service Guide...