73
/
88
jet air valve to the discharge line are closed,
the top air line (air line entering the tank
from the top of the tank) valve should be
opened and the internal pressure of the
tank should expected to rise up to 2 bar with
the compressed air supplied from the
compressor. This pressure value of 2 bars
can be seen from 2 manometers on the air
line.
Air battery
1- Air ventilation
2- Jet air line
3- Fluidiser line
4- Top air line
When the internal pressure of the tank re-
aches 2 bar (it reaches this value in 1.5-2
minutes with the appropriate compressor),
open the connection of the jet air line, open
the discharge valve and start the discharge
of the material. First, open the fluidization
valve in the collector a quarter, in order to
prevent the flow of material from accumula-
ting in the discharge cone. After the flow
starts, open it fully so that the flow accele-
rates.
Discharge cone
Activate the hydraulic pump by opening the
pump start button next to the pneumatic
control. By pressing the pneumatic control
lever in the lifting direction, lift the front of
the tank with the hydraulic lifting cylinder so
that the material flow to the rear. Raise and
lower the tank lift cylinder with the joystick,
and the lowering of the tank can be achie-
ved by using the hydraulic valve at the front.
Hydraulic control panel