Page 51
Garden Building
Installation Guide
Product Code : TGBv6.1 / November 2011
Octagonal Garden Building Models
Position the triangular roof glazing sheets
between the roof glazing bars allowing an
even gap between the edge of the roof
glazing sheets and the roof bars.
Recommended Method of Glazing
When you are glazing your conservatory
roof it is recommended that you place the
roof glazing sheet labelled ‘G1’into position
first. Then by use of a step ladder through
the empty ‘G2’ roof glazing sheet position
you will have good access to put on the spar
top cap labelled ‘P1’ first. Then place ‘G2’
roof glazing sheet into position whilst getting
good access to put on ‘P2’ spar top cap by
use of your stepladder in the empty ‘G3’ roof
glazing sheet position.
If you choose to install the roof glazing
sheets and glazing bar top caps in this way
it is imperative that you read both the
Glazing Installation and the Glazing Bar
Installation sections prior to glazing your
conservatory roof.
When satisfied that the roof glazing sheets
are in place, gently pull on the glazing tape
protective film on the eaves beam closure
situated in the eaves beam (A5080) in a
downwards motion while pressing firmly
down on the roof glazing sheet to make sure
that it remains in position afterwards.
Continue to fit all others as previously
described.
PLEASE NOTE IT IS NOT UNCOMMON FOR
CONDENSATION TO APPEAR IN THE FLUTES
OF THE POLYCARBONATE ROOF GLAZING
SHEETS FROM TIME TO TIME.
THE ‘BREATHER’ TAPE PRE-FITTED TO THE
BOTTOM OF THE POLYCARBONATE ROOF
GLAZING SHEETS IS DESIGNED TO ALLOW
THE
MOISTURE
TO
EVAPOURATE
NATURALLY.
DO NOT BREAK THE SEAL ON THE
BREATHER
TAPES
IN
ATTEMPT
TO
INCREASE THE VENTILATION INTO THE
FLUTES OF THE POLYCARBONATE ROOF
GLAZING SHEETS.