Page 65
Garden Building
Installation Guide
Product Code : TGBv6.1 / November 2011
Check that you have sealed the joints
inbetween the eaves beam closure (P6056)
and the glazing bar under cladding on each
window, and that the glazing tape protective
film has been removed.
Select the eaves beam internal cover
(P6042), position onto the barbs on the
eaves beam (A5080) and press home.
Select the eaves beam 135° joint cover
(C9111), and push home into the corner
gaps between the eaves beam internal
cover (P6042).
Select the 135° corner post cover (P113) for
the 135° corner post (A110).
Position the 135° corner post cover (P113)
over the barbs at the bottom of the corner
post (A110) and by working upwards press
home.
The 18mm coupling covers (P125) will
require trimming to fit underneath the
external eaves beam trim (P6024) and the
eaves beam covers (P6042).
Select an 18mm coupling cover (P125) and
position onto the barbs on the inside of the
135° corner post (A110) and push firmly to
fit.