Power drill the 6.0 x 120mm yellow screws 
down through the holes in the eaves beam 
(A5080). 

 

 

 
Do not use the 6.0 x 120mm yellow screws 
to fix the eaves beam (A5080) to the double 
door outer frame.  

Silicone seal the gaps between the front of 
the eaves beam external trim (P6024) and 
the front of the windows to create a water-
tight seal. 
 

For  the  attachment  of  this  frame  use  four 
70mm fixing screws (SC045) as used to attach 
the double door outer frame to the 150mm sill 
(P106),  pre-drilling  upwards  from  inside  the 
Double door outer frame and up into the eaves 
beam (A5080) as shown.

 

 

 

 
 
 
 
 
 
 
 
 
 
 

Содержание TGBv6.1

Страница 1: ...ber 2011 For Customer Services parts delivery enquiries only call 01254 683 079 For Technical Support installation queries call 0871 574 7293 Technical support calls cost 10p per minute from BT landlines other carriers and mobile networks may vary Garden Building Models ...

Страница 2: ...to method and technique rather than a strict step by step guide Methods and components are subject to change without notice and no responsibility will be accepted for any issues arising from such changes Printed installation guides for our products are supplied as necessary upon purchase however due to the limitations of promptly updating printed copies the PDF versions available online at www k2c...

Страница 3: ...e descriptions and item numbers are shown on your checklists along with another graphic for identification so you may sort out these parts prior to commencing each section You will not need to collate any other parts from your packaging until it is outlined in a component reference page The only exception is silicone sealant as this is needed continually as you work through the build process which...

Страница 4: ...hazards Put controls in place to manage any possible vehicular movement on site Protect the environment by avoiding fugitive waste Dispose of your rubbish appropriately Personal Protective Equipment The following PPE should be worn throughout the construction A hard hat Safety foot wear The following PPE should be worn under certain conditions follow machinery guidelines where applicable Anti slip...

Страница 5: ...e intended Anyone below you They could be injured if you drop something If scaffolding is to be erected this should be done only by a suitably qualified contractor You are advised to ask the contractor to show you an appropriate certificate of qualification Ensure any scaffold is scaff tagged 4 Tools The tools you use are your responsibility We advise Check the condition of your tools prior to use...

Страница 6: ...s less fatiguing than keeping the fingers straight If it is necessary to vary the grip as the lift proceeds do this as smoothly as possible DON T JERK MOVE THE FEET KEEP CLOSE TO THE LOAD PUT DOWN THEN ADJUST If precise positioning of the load is necessary put it down first and then slide it into the desired position TEAM LIFTING It is important team members are physically evenly matched One perso...

Страница 7: ...part description from your installation manual e g 150mm Sill End Caps The page where the part is described in the installation manual e g Page 9 Delivery damage It is also recommended that all components are checked for delivery damage On receipt of delivery please check the packaging carefully prior to signing the delivery note It is also good practice to check your components prior to assembly ...

Страница 8: ...Square Garden Building also uses a total of four Edwardian hip spars which connect to a 25 Edwardian boss end C9170 situated on each end of the 25 ridge The Octagonal Garden Building The Octagonal Garden Building has angled corners called facets The windows around the Garden Building are therefore joined by 135 corner posts A110 The Octagonal Garden Building uses a total of eight Victorian hip spa...

Страница 9: ...N 2i FITTING FIRST WINDOWS SECTION 3i Large Octagonal Garden Building Only FITTING WINDOWS IN A STRAIGHT RUN SECTION 4 FITTING EAVES BEAM SECTION 5i GAZEBO RIDGE INSTALLATION OCTAGONAL ONLY SECTION 7 GLAZING SECTION 1i BASE SILL INSTALLATION OCTAGONAL GARDEN BUILDING ORDER OF ASSEMBLY ...

Страница 10: ...de TGBv6 1 November 2011 SECTION 9 GAZEBO COVER INSTALLATION SECTION 11 DOUBLE DOOR INSTALLATION SECTION 12i TRIMS FINISHING SECTION 13 GUTTER INSTALLATION SECTION 8 SPAR CAPPINGS SECTION 1ii BASE SILL INSTALLATION SQUARE GARDEN BUILDING ORDER OF ASSEMBLY ...

Страница 11: ...ON 2ii FITTING FIRST WINDOWS SECTION 3ii FITTING WINDOWS IN A STRAIGHT RUN SECTION 4 FITTING EAVES BEAM SECTION 5ii RIDGE INSTALLATION SQUARE GARDEN BUILDING ONLY SECTION 8 GLAZING SECTION 6 INTERMEDIATE SPARS SQUARE GARDEN BUILDING ONLY SECTION 7 TIE BARS SQUARE GARDEN BUILDINGS ONLY ...

Страница 12: ...uilding Installation Guide Product Code TGBv6 1 November 2011 SECTION 11 RIDGE COVER INSTALLATION SECTION 12 DOUBLE DOOR INSTALLATION SECTION 13ii TRIMS FINISHING SECTION 14 GUTTER INSTALLATION SECTION 9 SPAR CAPPINGS ...

Страница 13: ...er 2011 1i OCTAGONAL GARDEN BUILDING BASE SILL COMPONENT REFERENCE Item No Item Description Comments P106 150mm Sill C109 External 135 Sill Connector C110 In line Sill Connector Specific models only SC025 3 9 x 16mm Reinforcing Screws SC030 100mm Fixing Bolts SC030 SC025 ...

Страница 14: ...mber 2011 1ii SQUARE GARDEN BUILDING BASE SILL COMPONENT REFERENCE Item No Item Description Comments P106 150mm Sill C108 External 90 Sill Connector C110 In line Sill Connector Specific models only SC025 3 9 x 16mm Reinforcing Screws SC030 100mm Fixing Bolts SC030 SC025 ...

Страница 15: ...4 hours before peeling the excess away cleanly When using sealant as a filler bead mask both sides of the bead area with masking tape Run a bead of sealant along the bead area exerting an even pressure on the sealing gun Always refer to the manufacturers instructions for removing excess sealant Fitting the Sill Please note the following section describes the installation of the Square Garden Build...

Страница 16: ...spent getting the base sill layout correct will save time later in the installation as paying attention to the base sill dimensions positioning and making sure it is level will ensure the correct fitting of the rest of the conservatory Lay the 150mm sill P106 in position and using your roof plan located with your check list ensure that dimensions A and B are consistent across the entire width and ...

Страница 17: ... fixing bolts SC030 The 100mm fixing bolts SC030 should be positioned 100mm from each end of the 150mm sill P106 and equally spaced between If your conservatory uses a pre fabricated steel base please use the self drilling screws provided with the steel base fixing kit referring to the installation guide supplied Check your sill layout again for square ...

Страница 18: ... TGBv6 1 November 2011 2i OCTAGONAL GARDEN BUILDING FIRST WINDOWS COMPONENT REFERENCE Item No Item Description Comments C105 Quarter Turn Button C106 Sill Support Block Pre assembled SC012 60mm Fixing Bolts CON046 6mm Allen Key A115 135 Corner Post CON 046 ...

Страница 19: ...e Product Code TGBv6 1 November 2011 2ii SQUARE GARDEN BUILDING FIRST WINDOWS COMPONENT REFERENCE Item No Item Description Comments C105 Quarter Turn Button C106 Sill Support Block Pre assembled CON046 6mm Allen Key A109 90 Corner Post CON 046 ...

Страница 20: ...s will be corrected as the window connectors are slid into position You will notice that each window corner has the inner legs on the window detail notched away It is imperative that this detail is present to ensure that all 18mm inline couplings A104 can slide into position The notch detail is highlighted below Select the first window and position over the milled out sections in the 150mm sill P1...

Страница 21: ... P106 where both windows meet Select the 90 corner post A109 and slide into the gap between the windows so that the leg detail interlocks with the leg detail on the windows as shown below The prongs on the 90 corner post A109 should face the outer corner of the 90 sill connector C108 as shown below On Octagonal Garden Building models the 135 corner post A115 is used This should be assembled as sho...

Страница 22: ...rn button C105 90 and the quarter turn button C105 will click into position Repeat the process on the second outer side of the 90 corner post A109 Eight quarter turn buttons C105 per face of the 90 corner post A109 should be attached to the 90 corner post A109 as shown below When both windows connected to the 90 corner post A109 are in position silicone seal the vertical joint between them to prev...

Страница 23: ...1 November 2011 3i OCTAGONAL GARDEN BUILDING WINDOWS IN A RUN COMPONENT REFERENCE Item No Item Description Comments C105 Quarter Turn Button C106 Sill Support Block Pre assembled CON046 6mm Allen Key A107 Adjustable Inline Coupling SC045 70mm Fixing Screw CON 046 ...

Страница 24: ...1 3ii RECTANGULAR GARDEN BUILDING WINDOWS IN A RUN COMPONENT REFERENCE Item No Item Description Comments A104 18mm Inline Coupling C105 Quarter Turn Button C106 Sill Support Block Pre assembled CON046 6mm Allen Key A107 Adjustable Inline Coupling SC045 70mm Fixing Screw CON 046 ...

Страница 25: ...ch window corner has the inner legs on the window detail notched away It is imperative that this detail is present to ensure that all 18mm inline couplings A104 can slide into position The notch detail is highlighted at the top of the next column Please note Any slight bow in the windows will be corrected as the window connectors are slid into position Fitting the Intermediate Window Check that th...

Страница 26: ...is the Octagonal Garden Building model all the inline window couplings will be adjustable ones Similarly if your conservatory model is the Rectangular Garden Building the last two windows in every straight run will be joined by the same adjustable inline couplings A107 These adjustable inline couplings A107 allow for adjustment to ensure that the windows will finish in the correct position at the ...

Страница 27: ...in 3 variant positions as shown below and should be interlocked prior to assembly 18mm Adjustment if no further adjustment is necessary 20mm Adjustment 22mm Adjustment When the adjustable inline couplings A107 are interlocked to the required setting they are slid between the two adjacent windows in the same way as the 18mm inline couplings A104 Remember to silicone seal around the bottom of the 18...

Страница 28: ...click into position Continue to fit the rest of the quarter turn buttons C105 into the 18mm inline coupling A104 as described Six quarter turn buttons C105 per face of the 18mm inline coupling A104 should be attached on dwarf wall models inside and out and eight quarter turn buttons C105 per full height model conservatory again eight inside and eight on the outside A quick check between the two wi...

Страница 29: ...r outer frame The windows are permanently fixed together in the same way as any other window using the quarter turn buttons C105 and the 6mm Allen Key CON046 as described previously The double door outer frame is positioned like all other windows with the exception that it is not slid onto the 150mm sill P106 but simply placed into position Again check that the inner legs on the outer frame window...

Страница 30: ...Page 30 Garden Building Installation Guide Product Code TGBv6 1 November 2011 A quick check between the two windows should show 18mm ...

Страница 31: ...BEAM COMPONENT REFERENCE Item No Item Description Part Number 1 Eaves Beam A5080 3 Pivot Bolt Assembly C9144 Eaves Beam Connector C9068 5 Eaves Beam Closure P6056 6 6 35 x 38mm Eaves Connector Screw C9132 7 6 0 x 120mm Yellow Eaves to Frame Screw SK007 2 Eaves Beam External Trim P6024 4 ...

Страница 32: ...joiner C9068 is fixed using the 6 35 x 38mm silver screws C9132 through the pre drilled holes Four 6 35 x 38mm silver screws C9132 are required to join the eaves beam inline joiner C9068 to the eaves beams A5080 Attach the eaves beam external trim P6024 onto the front of the eaves beam A5080 as shown remembering to remove the protective film on the outer frame Position the eaves beam A5080 central...

Страница 33: ...shown below and slid into the channels on the inside of the eaves beam A5080 Prior to joining the eaves beam A5080 apply a bead of silicone to the mitred cut faces as shown below The eaves beam connectors C9068 are fixed into position by use of the 6 35 x 38mm silver screws C9132 through the pre drilled holes When all the eaves beams A5080 are assembled on top of the windows drill through the eave...

Страница 34: ...aves beam A5080 to the double door outer frame Silicone seal the gaps between the front of the eaves beam external trim P6024 and the front of the windows to create a water tight seal For the attachment of this frame use four 70mm fixing screws SC045 as used to attach the double door outer frame to the 150mm sill P106 pre drilling upwards from inside the Double door outer frame and up into the eav...

Страница 35: ...e TGBv6 1 November 2011 5i OCTAGONAL GARDEN BUILDING RIDGE COMPONENT REFERENCE Item No Item Description Part Number 1 Pivot Bolt Assembly or M5 x 20mm Roofing Bolt C9144 C8017 3 Victorian Hip Bar 25 Gazebo Boss C9026 5 M5 Flange Nut Transom Glazing Bar 2 4 ...

Страница 36: ...n Slot the holes at the bottom of the Victorian hip bar over the M5 x 25mm bolts located in the single bolt retainers which sit either side of the eaves beam corner From the underside of the gazebo boss C9026 pass a double bolt retainer C9144 through the corresponding holes in the boss and the Victorian hip bar Please note that M5 x 20mm roofing bolts C8017 may have been provided as an alternative...

Страница 37: ...ard Ridge Centre C9019 6 Pivot Bolt Assembly or M5 x 20mm Roofing Bolt C9144 C8017 M5 Flange Nut M5 x 25mm Bolt C9142 Georgian Hip Bar Transom Glazing Bar 1 Universal Ridge Wing A5081 25mm Ridge End Centre C9061 Top Cloaking Trim P6031 5 Bottom Cloaking Trim P6028 8 25 Mini Boss End C9170 Item No Item Description Part Number 3 4 7 9 10 11 2 ...

Страница 38: ...mble the glazing bars if all the M5 flange nuts are removed from the double bolt retainers in the eaves beam and the universal ridge wings and kept about your person for use as and when you require them Select the mini boss end C9170 for attachment to the universal ridge wings A5081 It is easier if both the mini boss ends C9170 are assembled to the ridge before you lift the ridge assembly into pos...

Страница 39: ...y support the ridge assembly in the correct position Slot the holes at the bottom of the Georgian hip bar over the M5 x 25mm bolts located in the single bolt retainers that sit either side of the eaves beam corner Now locate a double bolt retainer from underneath the boss end and through the holes Slot the top of the Georgian hip bar over the double bolt retainer and loosely attach the M5 flange n...

Страница 40: ...2011 6 SQUARE GARDEN BUILDING INTERMEDIATE SPARS COMPONENT REFERENCE Item No Item Description Part Number 1 Georgian Hip Bar 2 Transom Jack Rafter Glazing Bar Jack Rafter Bracket Kit C9196 6 Domed Bolt C9165 M5 x 16mm Hex Head Set Screw Nut C9244 3 4 5 M6 Flange Nut 3 4 5 6 ...

Страница 41: ...ten at this stage Repeat for any more transom glazing bars that connect to the 25 pitch ridge Jack Rafters The final set of glazing bars the jack rafters need to be fitted The jack rafter glazing bars have tops which are cut at an angle and when in position will run perpendicular from the eaves beam until they meet and attach to the Georgian hip glazing bar Before attaching the jack rafter slide t...

Страница 42: ...irmed by performing dimensional checks between the intermediate rafter centres These dimensions shown on your roof plan are taken from the centre line of the transom glazing bars If all the glazing bars are correctly positioned tighten the M5 locking nuts Now that all glazing bars are in position you must tighten all the M5 locking nuts which keep the glazing bars in place on the eaves beam Finish...

Страница 43: ... Guide Product Code TGBv6 1 November 2011 7 SQUARE GARDEN BUILDING TIE BARS Certain Models Only Item No Item Description Part Number 1 Tie Bar Rods with nuts 3m C8005 2 3 Way Tie Bar Centre Boss Kit C9069 3 Fixing Lug and Clevis Kit C9071 ...

Страница 44: ...nd conduit is fixed vertically into the ridge from the tie bar centre boss Firstly attach the vertical tie bar rod through the ridge Slide a M10 fixing nut into the ridge centre over the pre drilled hole With the locking nut in place screw the vertical tie bar rod into place through the ridge centre and into the locking nut At this stage it is a good time to fit the ridge under cladding with the t...

Страница 45: ... raise them all together towards the centre and thread the ends of the tie bar rods through the holes in the 3 way tie bar centre boss Raise the tie bar centre boss until the three rods protrude into the boss When the tie bar centre boss assembly is in place thread on the M10 tie bar centre boss locking nuts Check the horizontal tie bar rods for level before tightening the M10 tie bar centre boss ...

Страница 46: ...e permanently fixed push fit the bolt cover caps over the M10 x 30mm Nyloc nut and bolt Select one of the tie bar boss covers and screw the centre thread into position Position the remaining centre boss cover over the centre thread and rotate into position Position the tie bar cover on to the centre boss ...

Страница 47: ...rden Building Installation Guide Product Code TGBv6 1 November 2011 8 ROOF GLAZING COMPONENT REFERENCE 1 Roof Glazing Sheet 2 Glazing End Trim P6054 3 Eaves Beam Closure P6056 Item No Item Description Part Number ...

Страница 48: ...ining with muntin bars Instruction on how to install this is detailed at the back of this installation guide If not already installed fit all the eaves beam closure P6056 into eaves beam A5080 This trim will snap fit into the channels of the eaves beam between the glazing bars Do not remove the glazing tape protective film at this point It is recommended to apply a bead of silicone to the gap betw...

Страница 49: ...s will help protect the roof glazing sheet from any unnecessary damage The inner protective film can be completely removed once all plaster work is complete Start with the roof glazing sheets against the wall and to the left with the face that had the printed film facing outwards This first sheet will be labelled as G1 Prior to fitting the roof glazing sheets it is recommended to peel back around ...

Страница 50: ... Allow the roof glazing sheet to gently rest on to the eaves beam closure P6056 Fitting Roof Glazing Sheets around Jack Rafters Lay the roof glazing sheet between the jack rafters and allow it to rest on to the eaves beam closure If positioned correctly there will be an approximate gap of 8mm between the sides of the roof glazing sheet and the centre stems on the jack rafters The top edge of the r...

Страница 51: ... install the roof glazing sheets and glazing bar top caps in this way it is imperative that you read both the Glazing Installation and the Glazing Bar Installation sections prior to glazing your conservatory roof When satisfied that the roof glazing sheets are in place gently pull on the glazing tape protective film on the eaves beam closure situated in the eaves beam A5080 in a downwards motion w...

Страница 52: ...ion and stuck to the eaves beam closure it is time to attach the top caps to the glazing bars This is for two reasons firstly to permanently keep the roof glazing sheets in place and secondly to create a water tight seal 1 Glazing Bar Top Cap Glazing Bar End Cap C9038 3 Screw Cover Cap 4 3 9 x 19mm Yellow Screw C9176 Item No Item Description Part Number 2 2 3 4 ...

Страница 53: ... connector These top caps are positioned over the hip glazing bars and are attached in the same manner as the other transom bar top caps When the glazing bar top cap is attached ensure that the bottom face of the top cap is aligned with the bottom face of the glazing bar Remove the protective film from the glazing bar top cap When assembling the glazing bar top caps onto the glazing bars support c...

Страница 54: ...mber 2011 10 OCTAGONAL GARDEN BUILDING RIDGE CAPPINGS COMPONENT REFERENCE 1 Finial C7012 2 Gazebo Fixing Kit C9054 3 Gazebo Foam Bung C9051 4 Gazebo External Boss Cover C9031 5 Gazebo Internal Boss Cover C9032 Item No Item Description Part Number 6 25 Gazebo Boss C9026 ...

Страница 55: ...azing bars Ensure that the bung touches the end faces of all the glazing bars Once in position seal the glazing and the hip and glazing bar top caps to the gazebo foam bung with a continuous bead of silicone Fitting the Garden Building Covers Slot the first flange nut into the gap between the finial fixing bracket and the finial C7012 and screw fully into the nylon rod If you had to remove the bra...

Страница 56: ...ion Locate the nylon rod through the hole in the top of the gazebo external boss cover C9031 and secure in position with the nylon flange nut fitted to the underside of the cover Insert the threaded bar through the hole in the aluminium gazebo boss Locate the gazebo internal boss cover C9032 over the nylon rod and secure in position by fully tightening the remaining flange nut Trim the end of the ...

Страница 57: ...COMPONENT REFERENCE 1 25 Variable Pitch Ridge 3 Universal Foam Bung C7023 SRP3 Boss End Foam Trim C9350 SRP2 Square External Boss Cover C9029 R5 Ridge Holding Down Bolts C8031 RP1 External Ridge Cover P6027 4 5 6 2 Item No Item Description Part Numbers 7 Plain Cresting as shown Ornate Cresting 8 Finial C7013 C7015 C7012 ...

Страница 58: ...e silicone provided run a continuous bead around the joint between the foam bung and the glazing and the glazing bar top caps being careful to avoid gaps in the sealant Repeat for the Georgian boss end on the opposite end of the ridge assembly Fitting the Ridge Covers When fitting the ridge covers you must first attach the boss end foam trim around the perimeter of the underside of the boss end co...

Страница 59: ...will be Remove the cresting trim and reinsert into position Slide the second finial onto the square external boss cover Lift the ridge capping assembly onto the top of the ridge assembly and push down so that it locates onto the prongs of the ridge centres When assembling the external ridge cover support can be gained by use of conservatory ladders or by spreading your leaning weight on boards pos...

Страница 60: ...er 2011 12 DOOR COMPONENT REFERENCE 1 Hinge Pin Cover Cap 2 Hinge Pin Mk2 3 Outer Frame Hinge Mk2 e 4 Hinge Pin Grub Screw 5 Outer Hinge Adjuster 6 Sash Hinge Adjuster 7 Sash Hinge Cover 8 Sash Hinge Adjustment Cover Cap Item No Item Description Comments 1 1 2 5 3 8 7 6 4 ...

Страница 61: ... outer frame The hinge pin hinge pin cover cap and hinge pin grub screw are supplied seperately To hang the door lift and slide the door sash assembly to allow the sash hinge adjuster to slide in between the outer frame hinge Once in position pass the hinge pins through both hinge parts It may be necessary to tap each pin down using a mallet Do not fit the outer hinge cover and sash hinge cover ca...

Страница 62: ...o lift the door sash A maximum lift of 4mm can be achieved Horizontal front to back adjustment can obtained by inserting the 5mm Allen key into socket 2 in the top of the outer frame hinges and turning 90º in either direction to adjust the compression of the door sash N B The hinge pin grub screw will need to be removed to allow this adjustment Horizontal left to right adjustment of the sash can b...

Страница 63: ...nd locking is a smooth operation Connecting the Restrictor Arm When both double doors sashes are in position the restrictor arm assemblies can be connected These are found in two parts that are already attached to the top of both door sashes and the top inside corners of the door outer frame The restrictor arms are taped into position for transit The tape should be removed prior to installation Lo...

Страница 64: ... TGBv6 1 November 2011 13i OCTAGONAL GARDEN BUILDING TRIMS AND FINISHING COMPONENT REFERENCE Item No Item Description Part Number 1 Eaves Beam Internal Cladding P6042 2 Eaves Beam 135 Joint Cover C9111 3 135 Corner Post Cover P114 4 18mm Coupling Cover P125 ...

Страница 65: ...t the eaves beam 135 joint cover C9111 and push home into the corner gaps between the eaves beam internal cover P6042 Select the 135 corner post cover P113 for the 135 corner post A110 Position the 135 corner post cover P113 over the barbs at the bottom of the corner post A110 and by working upwards press home The 18mm coupling covers P125 will require trimming to fit underneath the external eaves...

Страница 66: ... covers P125 and position onto the recesses on the sides of each quarter turn button C105 positioned on the 18mm inline couplings A104 and press home Repeat for each set of 18mm inline couplings including the ones on the inside Fit the handles to all opening sashes using the 5 x 45mm handle screw SC035 ...

Страница 67: ...EN BUILDING TRIMS AND FINISHING COMPONENT REFERENCE Item No Item Description Part Number 1 Eaves Beam Internal Cover P6042 2 90 Corner Post Cover P113 3 Ridge Internal Cover P6042 4 18mm Coupling Cover P125 5 Square Internal Boss Cover C9030 6 90 Eaves Beam Joint Cover C9108 7 End Boss Bracket C9040 ...

Страница 68: ... the correct pitch of the roof Offer the square internal boss cover C9030 up to the Edwardian boss end The square internal boss end cover is positioned so it s upstand fits tight against the rear face of the end boss C9170 Use the M4 x 25mm self tapping screw to fix the square internal boss cover to the L shaped bracket attached to the end of the aluminium ridge section The square internal cap sho...

Страница 69: ... the bottom of the 90 corner post A109 and by working upwards press home Select the 18mm coupling covers P125 and position onto the recesses on the sides of each quarter turn button C105 positioned on the 18mm inline couplings A104 and press home Repeat for each set of 18mm inline couplings including the ones on the inside Fit the handles to all opening sashes using the 5 x 45mm handle screw SC035...

Страница 70: ... Downpipe 2 4m P6022 4 Ogee Gutter Stop End Outlet opposite hand to 5 C9188 5 Ogee Gutter Stop End Outlet as shown below C9187 6 Ogee Gutter Stop End pair C8042 7 135 Downpipe Bend C9012 8 Downpipe Retention Clip C8056 9 Downpipe Shoe C9013 10 Ogee Gutter Inline Union C8035 11 Ogee 135 External Gutter Corner C8037 12 Ogee 90 External Gutter Corner C8040 13 Ogee Running Outlet C8036 14 Ogee Gutter ...

Страница 71: ...of the bracket into the groove on the eaves beam Pull the bracket downwards until it locks into place Hang the front edge of the gutter onto the bracket and rotate up the back of the bracket as shown Fit only to the first click do not push all the way up Where there are stop ends or outlets on the gutter you will need gutter joint clips to fix these in place Offer the gutter joint clips over the g...

Страница 72: ...pipe and fixed into position with the screws provided On dwarf wall models you will need to cut the round downpipe P6022 into two lengths and join them together by use of the downpipe bends C9012 This is to allow the round downpipe to sweep over the 150mm sill P106 and down the dwarf wall to the ground The cut in the round downpipe is to produce two lengths that suit the height of the window frame...

Страница 73: ...wing through the slot Friction Hinges While the window is open lubricate all moving parts of the hinges with oil Doors Move the operating handle to open the door locate and lubricate all locking points with oil Lightly oil all hinges Cleaning The need for cleaning your PVC U conservatory will vary in frequency depending on where you live Some areas have a higher level of industrial pollution or na...