Page 20
Garden Building
Installation Guide
Product Code : TGBv6.1 / November 2011
Select the first window to be installed.
It is
imperative that the
drain slots in every
window are located at the bottom of the
window and facing front as shown below.
Please also note that two sill support
blocks (C106) are attached to the bottom
of the windows also shown below.
Before installation commences check each
window for any defects such as scratches or
bowing. If you find any defects please follow
the complaints procedure highlighted at the
front of this manual.
Please note: Any slight bow in the
windows will be corrected as the window
connectors are slid into position.
You will notice that each window corner has
the inner legs on the window detail notched
away. It is imperative that this detail is
present to ensure that all 18mm inline
couplings (A104) can slide into position.
The notch detail is highlighted below.
Select the first window and position over the
milled out sections in the 150mm sill (P106).
Slide the window towards the corner of the
150mm sill (P106).
Prior to the positioning of the window into its
final place, apply a bead of silicone to the
top of the 150mm sill (P106) and inline with
the rear face of the 150mm sill (P106).
Continue to slide the window towards the
corner of the sill so that the front edge is
inline with the rear face of the 150mm sill
(P106) on the adjacent corner.