This soft copy for use by IBM employees only.
/> ping 9.12.20.99 -c 1
PING 9.12.20.99: (9.12.20.99): 0 data bytes
8 bytes from 9.12.20.99: icmp_seq=0 ttl=255
----9.12.20.99 PING Statistics----
1 packets transmitted, 1 packets received, 0% packet loss
Figure 11. Output of a Successful Ping
It is important to plan the IP addressing scheme and hostnames before starting,
because changing them later after configuring your network could become a
major problem. There are procedures to change IP addresses and hostnames if
required, but this adds extra steps and complications, in some cases. Refer to
Appendix C, “IP Address and Hostname Changes for the SP” on page 273 for a
procedure to change IP addresses or hostnames for the SP nodes and Control
Workstation after initial installation and configuration. This procedure has been
tested in the lab environment based on the /etc/hosts file for name resolution.
This procedure has not been tested in other environments.
2.2.6 Maximum Number of Processes
As the AIX 4.1 default, the maximum number of processes allowed per user is
limited to 40. (This limit does not apply to a root user.) The possible values
range from 40 to 131072. Any increase in this number will take effect
immediately. Any decrease in this number will not become effective until the
next system boot.
Installing your RS/6000 SP system as a root user means that your system will
not affected by this limit. However, it is a good idea to increase this value,
based on your application requirements now, to cater to later requirements.
This will ensure that non-root users running various applications later during
production environment will not be limited by the default limit of 40 processes
per user.
As an example, the following command changes the maximum number of
processes allowed per user to 256. (Remember, this value needs to be set up to
cater to your environment.)
# chdev -l sys0 -a maxuproc=
′256′
2.2.7 Number of Licensed Users
Check and rectify the number of licenses that you have bought for AIX 4.1 from
IBM. By default, you will have two users licensed on your Control Workstation.
Any changes will be effective after system reboot. Use smit fastpath smit
chlicense or command line syntax:.
The following example shows how you can change the number of licensed users
to 64. This is only an example, and the actual value depends on what you have
bought from IBM.
# chlicense -u
′64′
14
SP PD Guide
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...