This soft copy for use by IBM employees only.
this information is essential during Estart if the Worm on the primary node is to
successfully initialize the switch in that partition.
In cases where the switch will not initialize within a partition, check that the
topology file was copied correctly into the files directory of the SDR by running
the following commands:
# cd /spdata/sys1/sdr/partitions/<IP alias>/files
# ls -l
The correct file should be listed in this directory. Take a look at the contents to
check that it contains the correct topology.
In addition, check that the SDR object class
Switch_partition contains the correct
filename for the topology file that is loaded in the SDR files directory. To do this,
run the following commands:
# export SP_NAME=<syspar_name>
# SDRGetObjects Switch_partition topology_filename
The SP_NAME variable can be used to set the current partition. If this variable
is not set, then the current partition will be the
primary partition as specified in
the node
′
s /etc/SDR_dest_info file. Commands such as
SDRGetObjects
will only
provide information about the current partition. This topic will be dealt with in
more detail later in the chapter. Any discrepancy in the two filenames will cause
Estart
to fail.
In this example of an 8_8 configuration, using layout.1, the two files that will be
loaded into the SDR files directories for each partition should be:
•
/spdata/sys1/syspar_configs/topologies/any.l1.8way1.0isb
•
/spdata/sys1/syspar_configs/topologies/any.l1.8way2.0isb
Run the following commands to check that SDR contains the correct information
about the topology files for each partition:
# export SP_NAME=<IP alias>
# SDRGetObjects Switch_partition topology_filename
The output of this
SDRGetObjects
command should be:
topology_filename
any.l1.8way1.0isb
For the other partition, it should be:
topology_filename
any.l1.8way2.0isb
It does not matter that you have multiple topology files in the files directory of
the SDR (although it may be preferable to remove redundant ones), as long as
the
Switch_partition object class is pointing to the correct one.
Debugging the switch on a partitioned system is similar to that on an
unpartitioned system. The specific differences will be covered throughout this
chapter, but the fundamentals remain the same. To recap briefly some of the
actions that may be appropriate in these circumstances:
•
Run
errpt
on all nodes to look for switch or Worm errors.
•
Look at the log files in /var/adm/SPlogs/css on the primary node in the
partition.
•
Ensure /etc/SP exists on the primary node in the partition.
136
SP PD Guide
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...