The system only uses these labels when reporting errors in the error log or the
css logs. If these labels are incorrect, then it will be difficult to debug problems
because the errors may be attributed to the wrong node.
Eannotator
physically checks which connections it is going through (that is, the
jack socket or the switch chip connection) to get to a node or switch chip and
will update the topology file accordingly. It converts what is initially logical
information to actual physical information. For example, L06 for logical frame 6
may be converted to E8 because this may be the 8th physical frame.
After migrating to the SP Switch, it is essential to run
Eannotator
after the
hardware installation because the jack connections have changed completely
from those which were used for the High Performance Switch. The system does
not use this information during initialization, needing only the
logical data to the
left of this in the file which describes each link on the network.
Eannotator
is run after the topology file has been selected as part of the
installation process.
Etopology
- Stores or reads a switch topology file into or out of the SDR.
After the switch topology file has been annotated, it will be stored to the SDR by
Etopology
during the installation process. The switch topology file stored in the
SDR can be overwritten by having an expected.top file in /etc/SP on the primary
node.
Estart
- Starts the switch
If Estart can find the file expected.top file in /etc/SP on the primary node, it will
use that to initialize the switch. Otherwise it will transfer the one stored in the
SDR on the Control Workstation to that directory on the primary node.
Estart_sw
is run on the primary to initialize all the nodes in the switch. For the High
Performance Switch this process will then clean up the topology file that was
placed in its /etc/SP directory so that a new one will get transferred at the next
Estart.
If the switch fails to initialize all nodes for any reason, always check to see if
there is a /etc/SP/expected.top file on the primary node. If there is, check to see
if it is the correct topology file, and that its contents are valid. For the High
Performance Switch the only reason one of these files should exist is if an IBM
engineer wishes to temporarily override the topology file in the SDR to assist in
the diagnosis of a possible hardware failure on the switch. Once that work has
been completed, the file should be removed and the SDR file should be used.
Check to see if any of these files exist on any of the nodes by running:
# dsh -a ls -l /etc/SP/expected.top
If one of these files exists, then check it out because if the primary is changed to
that node, it may affect the initialization of the switch.
For the SP Switch, this procedure is different. A check is made to see whether
there has been a change in the switch topology by referencing the SDR, and if
this is not the case it uses the existing topology that has been previously
Chapter 4. The Switch
105
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...