This soft copy for use by IBM employees only.
4. The SDR is not up or is not responding.
5. The current data in the SDR that relates to the partitioning has
inconsistencies or is incorrect.
Check and correct any problems associated with points 1, 2, and 3. If everything
is correct in these areas, then proceed to the next section to find out how to
resolve problems with the SDR.
5.3.6 Applying the System Partitioning
The key step at this point is to ensure that all
affected nodes are shutdown. This
is critical to the health of these nodes in the newly-partitioned environment.
Shutting them down is the best way to guarantee that all the daemons and files
will be configured correctly in the new partitions. Shut the nodes down in the
correct manner according to the normal working procedures on the system (that
is, in the correct order from the spmon GUI or the command line).
When the
spapply_config
command is run (without the
-v
flag), the following
tasks are carried out:
•
The SDR is restructured for the partitions and the multiple daemons are
created and started.
•
The
heartbeat and host_responds are restructured and the multiple daemons
are created and started.
•
The switch gets configured according to the new partitions (if there is one
installed).
•
Validates that the VSD configuration is consistent with the partition being set
up.
If the
apply fails, then record the error message that appears on the SMIT
screen. In order to debug this further, read the following sections about the SDR
and
heartbeat subsystems.
5.3.7 Validating the Partitions and Restoring the SDR
The option remains to restore the SDR that was archived earlier in the
procedure, but it is worth understanding why the
apply failed in case the same
problem occurs the next time you attempt to implement System Partitioning.
To restore the SDR, go to the SMIT menu Restore System Partition
Configuration, list the archived files, and select the appropriate backup or
archive to restore. This will run the following command:
# /usr/lpp/ssp/bin/sprestore_config
This script restores the original SDR and reverses the actions carried out in the
apply of the partitions. For example, it will stop and remove the multiple
daemons.
Even if the
apply was successful, it is still a good idea to run the following
command to verify that the partitioning configuration is good in the SDR before
the affected nodes are rebooted:
# splstdata -p
The
spapply_config
command calls the
spverify_config
command to check that
the SDR was updated correctly, but it can be run manually from the command
line as a final check.
144
SP PD Guide
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...