This soft copy for use by IBM employees only.
Make sure you know your system and know what your primary and secondary
dump devices are set to.
•
To list the current dump destination:
# sysdumpdev -l
primary
/dev/hd6
secondary
/dev/sysdumpnull
copy directory
/var/adm/ras
forced copy flag
TRUE
always allow dump
FALSE
•
To set the dump device:
# sysdumpdev
[
-P
]
{-p|-s} <device>
Dump devices are usually portable mediums such as tape drives. However, for
the SP nodes, those tape drives are not attached directly. You may copy the
content of the dump into a file, then transfer it to the Control Workstation, and
then download it to a tape.
A dump device can be configured either as a dedicated device that requires no
operator intervention when a dump occurs, or as a shared device that can be
used for other purposes until a dump is requested. A dedicated dump device is
referred to as the primary dump device, and a shared one as a secondary dump
device.
Operator intervention is required when a dump is to be written to the secondary
dump device. When you install the operating system, the dump device is
automatically configured for you. By default the primary device is /dev/hd6,
which is a paging logical volume, and the secondary device is /dev/sysdumpnull.
Note that for systems which have been migrated from AIX Version 3.2.5 to AIX
Version 4.1, the primary dump device is set to what it was formerly /dev/hd7.
Important
/dev/hd7 is the primary dump device by default on the SP nodes, even in
version 4.1. The reason for this is simple: Because /dev/hd6 is the paging
space, after a system dump the node comes back and waits in the S1 line for
a response about what to do with the system dump that resides in its paging
space.
Use the
sysdumpdev
command or SMIT to query or change the primary and
secondary dump devices.
•
To estimate the size of the dump for the current system:
# sysdumpdev -e
estimated dump size in bytes: 16250880
•
To display statistical information about the previous dump:
# sysdumpdev -L
Flags:
-l
List
-p
Primary
-s
Secondary
Chapter 8. Producing a System Dump
203
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...