4.5.1 The rc.switch Script
The rc.switch is run from the /etc/inittab during boot.
Whenever there is a problem initializing any of the nodes onto the switch, check
that the Worm daemon is running on the relevant nodes:
# ps -ef | grep Worm
If it is not running, then start it by running rc.switch script and check to ensure
the daemon stays up. If the Worm daemon is not running on the primary, then
none of the nodes will be initialized.
Always check the
/var/adm/SPlogs/css/rc.switch.log
to see any abnormal
behavior.
The content of various switch log files will be explained later in this section.
The
/usr/lpp/ssp/css/ifconfig
command configures or displays the network IP
interface parameters for the switch.
Always use this command in conjunction with the switch (css0 device) as
modifications had to made over standard TCP/IP implementation of AIX for this
network. Run the following command on the nodes to check that the
css0
interface is up and all the nodes have the same attributes.
# dsh -a /usr/lpp/ssp/css/ifconfig css0
Ensure that there no inconsistencies. For example, when a node does not have
ARP enabled when others do, it may not be possible to even
ping that node.
Run the following command to resolve this on that node:
# /usr/lpp/ssp/css/ifconfig css0 <switch IP address> arp
A detailed flow chart of this script can be found on Appendix A, “RS/6000 SP
Script Files” on page 229 under A.4, “The rc.switch Script” on page 262.
4.5.2 Switch Initialization
/usr/lpp/ssp/css/Estart_sw
is called by
/usr/lpp/ssp/bin/Estart
script, and is
run only on the primary node (oncoming for SP Switch). It is useful to know that
the timeout variable
LIMIT for the Estart command is located in this file. This
may have to be adjusted for systems that take longer than the default (180 sec).
Related Problem That Has Been Experienced:
The daemon must have enough time to go around and touch all of the switch
resources in the system. Due to heavy load on the primary node, there is a
possibility that the daemon will not finish the job within a timeout window. If the
timeout is reached, the switch network may experience switch faulting. The
problem has been experienced on systems that have primary nodes with heavy
Micro Channel loading. Also, the larger the system, the more time it takes to get
around the network. In this case, the probability increases that the timeout will
be reached.
Later in this section we will discuss how to diagnose this kind of problem by
analyzing the switch log files.
108
SP PD Guide
Содержание RS/6000 SP
Страница 2: ......
Страница 14: ...This soft copy for use by IBM employees only xii SP PD Guide...
Страница 16: ...This soft copy for use by IBM employees only xiv SP PD Guide...
Страница 106: ...This soft copy for use by IBM employees only 86 SP PD Guide...
Страница 178: ...This soft copy for use by IBM employees only 158 SP PD Guide...
Страница 214: ...This soft copy for use by IBM employees only 194 SP PD Guide...
Страница 248: ...This soft copy for use by IBM employees only 228 SP PD Guide...
Страница 250: ...This soft copy for use by IBM employees only Figure 102 setup_authent Script Flow Chart 2 7 230 SP PD Guide...
Страница 252: ...This soft copy for use by IBM employees only Figure 104 setup_authent Script Flow Chart 4 7 232 SP PD Guide...
Страница 254: ...This soft copy for use by IBM employees only Figure 106 setup_authent Script Flow Chart 6 7 234 SP PD Guide...
Страница 258: ...This soft copy for use by IBM employees only Figure 110 install_cw Script Flow Chart 3 3 238 SP PD Guide...
Страница 260: ...This soft copy for use by IBM employees only Figure 112 setup_server Script Flow Chart 2 23 240 SP PD Guide...
Страница 262: ...This soft copy for use by IBM employees only Figure 114 setup_server Script Flow Chart 4 23 242 SP PD Guide...
Страница 264: ...This soft copy for use by IBM employees only Figure 116 setup_server Script Flow Chart 6 23 244 SP PD Guide...
Страница 266: ...This soft copy for use by IBM employees only Figure 118 setup_server Script Flow Chart 8 23 246 SP PD Guide...
Страница 268: ...This soft copy for use by IBM employees only Figure 120 setup_server Script Flow Chart 10 23 248 SP PD Guide...
Страница 270: ...This soft copy for use by IBM employees only Figure 122 setup_server Script Flow Chart 12 23 250 SP PD Guide...
Страница 272: ...This soft copy for use by IBM employees only Figure 124 setup_server Script Flow Chart 14 23 252 SP PD Guide...
Страница 274: ...This soft copy for use by IBM employees only Figure 126 setup_server Script Flow Chart 16 23 254 SP PD Guide...
Страница 276: ...This soft copy for use by IBM employees only Figure 128 setup_server Script Flow Chart 18 23 256 SP PD Guide...
Страница 278: ...This soft copy for use by IBM employees only Figure 130 setup_server Script Flow Chart 20 23 258 SP PD Guide...
Страница 280: ...This soft copy for use by IBM employees only Figure 132 setup_server Script Flow Chart 22 23 260 SP PD Guide...
Страница 284: ...This soft copy for use by IBM employees only Figure 136 rc switch Script Flow Chart 3 8 264 SP PD Guide...
Страница 286: ...This soft copy for use by IBM employees only Figure 138 rc switch Script Flow Chart 5 8 266 SP PD Guide...
Страница 288: ...This soft copy for use by IBM employees only Figure 140 rc switch Script Flow Chart 7 8 268 SP PD Guide...
Страница 290: ...This soft copy for use by IBM employees only 270 SP PD Guide...
Страница 292: ...This soft copy for use by IBM employees only 272 SP PD Guide...
Страница 300: ...This soft copy for use by IBM employees only 280 SP PD Guide...
Страница 304: ...This soft copy for use by IBM employees only 284 SP PD Guide...
Страница 308: ...This soft copy for use by IBM employees only 288 SP PD Guide...
Страница 310: ...This soft copy for use by IBM employees only 290 SP PD Guide...
Страница 316: ...IBML This soft copy for use by IBM employees only Printed in U S A SG24 4778 00...