Operation
5.1 Operation Function ·············································· 5-1
5.2 Address Configuration ·········································· 5-2
5.2.1 Overall address configuration example ························ 5-3
5.2.2 Gateway status signals ············································ 5-6
5.2.3 ELECYLINDER Position Table ··································· 5-8
5.2.4 Assignment of EC Connection Unit ····························· 5-11
5.3 I/O Signals ························································· 5-14
5.3.1 Input and Output Signal Features in EC Connection Unit ·· 5-14
5.3.2 Caution for REC System ·········································· 5-17
5.3.3 Timing of basic operation ·········································· 5-18
5.3.4 Basic Operations of ELECYLINDER ··························· 5-19
5.4 Gateway Parameter Configuration Tool ···················· 5-24
5.4.1 Tool startup ···························································· 5-24
5.4.2 Menu descriptions ··················································· 5-25
5.4.3 Explanation of Features in Special Parameter Setting ···· 5-27
5.4.4 Explanations of Monitoring Menu Features ·················· 5-30
R E C
Chapter
5
Содержание Rec
Страница 2: ......
Страница 25: ...Actuator Coordinate System ME0394 1A Intro 17 4 Rotary type 330 degree rotation specification 0 330 ...
Страница 133: ...Parameter 6 1 Parameter list 6 1 6 2 Parameter Details 6 2 R E C Chapter 6 ...
Страница 155: ...Revision history ME0394 1A Post 1 Revision history Revision date Revised content 2020 02 First Edition ...
Страница 156: ......
Страница 157: ......
Страница 158: ......