Figure 3-56
Labeling a new optical cable
Step 8
Lay out the new optical cable neatly in the cabinet and bind the cable with a binding strap.
The optical cable must be bound with adequate tightness and leaving enough space. Bind any
extra cable to the ODF side.
Step 9
Check whether the new optical cable is working normally.
l
Check the LINK indicator at the optical interface. If the indicator is steady green, the
link is Up.
l
Check whether the service on the board where the new optical cable connects is normal.
If services are normal, the optical cable is replaced successfully.
l
Check whether there is any new alarm or performance event.
----End
Follow-up Procedure
l
Gather up and store the tools and old optical cable.
l
Separate the old and the optical cables to avoid confusion.
HUAWEI USG9500 Series
Hardware Guide
3 Hardware Maintenance
Issue 03 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
414