2.1.3 Surveying the Installation Environment
Before installing the USG9500, check that the installation environment meets requirements to
ensure normal running and maximum service life of the USG9500.
lists installation environment check items.
Table 2-3
Installation environment checklist
Check Item
Requirements
Compliance
Site for the Equipment
Room
Equipment Room Site
Requirements
.
□
Y
□
N
□
N/A
Construction for the
equipment room
Construction
Requirements for the
Equipment Room
□
Y
□
N
□
N/A
Temperature
Requirements for
Temperature, Humidity,
and Altitude
□
Y
□
N
□
N/A
Relative humidity
□
Y
□
N
□
N/A
Altitude
□
Y
□
N
□
N/A
Neatness
.
□
Y
□
N
□
N/A
Corrosive Gases
.
□
Y
□
N
□
N/A
Electrostatic discharging
.
□
Y
□
N
□
N/A
Electromagnetic shielding
Electromagnetism
Requirements for the
Equipment Room
□
Y
□
N
□
N/A
Surge protection
Requirements for
Lightning Proof
Grounding
.
□
Y
□
N
□
N/A
Power supply facility
□
Y
□
N
□
N/A
2.1.4 Unpacking and Checking the Products
This section describes the procedure and precaution for unpacking and checking the products
before installation has started.