2.
Press the power button to power off the server.
CAUTION:
The main dc voltage is now removed from the system; however, ac voltage for
standby power is still present in the server.
3.
Unplug all power cables from the receptacles on the rear panel of the server.
Verifying Installed Components In the Server
This section describes how to verify that the components installed in the server are recognized
by the server.
Use the following procedure to verify that the components you have installed into the rx2660
server are recognized by the server.
NOTE:
The processor cache information in the Processor Module Information below shows
the L3 Cache Size per logical CPU. Since there are two logical CPUs per processor (dual-core),
a reading of 6 MB for the L3 cache means that the cache size is 12 MB.
1.
Select
EFI Boot Option
from the
EFI Boot Manager
menu.
2.
Wait for the
EFI Shell
prompt to appear.
80
Installing the Server