Heat & Glo • TRUE-36-IFT, TRUE-42-IFT, TRUE-50-IFT Installation Manual • 2461-980 Rev. Q • 11/20
2
Safety Alert Key:
• DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.
• WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.
• CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
• NOTICE: Used to address practices not related to personal injury.
Note: The term “recommend” or “recommended” does not indicate a requirement. It is a best practice suggested by
Hearth & Home Technologies
®
.
Table of Contents
Installation Standard Work Checklist . . . . . . . . . . . . . . . . . . . .
3
1 Product Specific and Important Safety Information
A. Appliance Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
B. Glass Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
C. BTU Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . .
4
E. Non-Combustible Materials Specification. . . . . . . . . . . . . .
4
F. Combustible Materials Specification . . . . . . . . . . . . . . . . .
4
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
H. California . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
I. Requirements for the Commonwealth of Massachusetts . .
5
2 Getting Started
A. Design and Installation Considerations . . . . . . . . . . . . . . .
6
B. Good Faith Wall Surface . . . . . . . . . . . . . . . . . . . . . . . . . .
6
C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . .
6
D. Inspect Appliance and Components . . . . . . . . . . . . . . . . . .
7
3 Framing and Clearances
A. Appliance/Decorative Front Dimension Diagrams . . . . . . .
8
B. Clearances to Combustibles . . . . . . . . . . . . . . . . . . . . . .
13
C. Constructing the Appliance Chase . . . . . . . . . . . . . . . . . .
17
D. Hearth Extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
4 Termination Location and Vent Information
A. Vent Termination Minimum Clearances . . . . . . . . . . . . . .
19
B. Chimney Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
C. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21
D. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21
E. Measuring Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22
F. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23
G. PVLP-SLP and PVI-SLP-B Information . . . . . . . . . . . . . .
30
5 Vent Clearances and Framing
A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . .
31
B. Wall Penetration Framing/Firestops . . . . . . . . . . . . . . . . .
31
C. Ceiling Firestop/Floor Penetration Framing . . . . . . . . . . .
32
D. Install Attic Insulation Shield . . . . . . . . . . . . . . . . . . . . . . .
32
E. Prepare for Heat Management . . . . . . . . . . . . . . . . . . . . .
33
6 Appliance Preparation
A. Vent Collar Preparation . . . . . . . . . . . . . . . . . . . . . . . . . .
34
B. Securing and Leveling the Appliance . . . . . . . . . . . . . . . .
35
C. Installing Non-Combustible Facing Material . . . . . . . . . .
36
7 Venting and Chimneys
A. Assemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
37
B. Secure the Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
38
C. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . .
38
D. Vertical Termination Requirements . . . . . . . . . . . . . . . . . .
39
E. Horizontal Termination Requirements . . . . . . . . . . . . . . .
40
8 Electrical Information
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41
B. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43
9 Gas Information
A. Fuel Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44
B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . .
44
E. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
45
10 Finishing
A. Facing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
46
B. Finishing Templates . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
47
C. Mantel and Wall Projections . . . . . . . . . . . . . . . . . . . . . . .
49
D. Decorative Front Dimensions for Finishing . . . . . . . . . . .
51
11 Appliance Setup
A. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . .
52
B. Remove the Shipping Materials . . . . . . . . . . . . . . . . . . . .
54
C. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
54
D. Install Glass Refractory
(TRUE-36G-IFT/TRUE-42G-IFT Only) . . . . . . . . . . . . . . .
55
E. Install Teco-Sil and Mystic Embers . . . . . . . . . . . . . . . . .
58
F. Glowing Ember Placement . . . . . . . . . . . . . . . . . . . . . . . .
59
G. LED’s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
59
H. Install the Log Assembly . . . . . . . . . . . . . . . . . . . . . . . . .
60
I. IntelliFire Touch
®
Control System Setup
. . . . . . . . . . . . .
66
J. Install Decorative Front . . . . . . . . . . . . . . . . . . . . . . . . . .
66
12 Reference Materials
A. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . .
67
B. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
74
= Contains updated information.