Heat & Glo • TRUE-36-IFT, TRUE-42-IFT, TRUE-50-IFT Installation Manual • 2461-980 Rev. Q • 11/20
Installation Standard Work Checklist
Customer:
Lot/Address:
Model (circle one): TRUE-36-IFT
TRUE-50-IFT
TRUE-42-IFT
Date Installed:
Location of Fireplace:
Installer:
Dealer/Distributor Phone #
Serial #:
Comments Communicated to party responsible ____________________ by ______________________on ___________
(Builder / Gen. Contractor/) (Installer)
(Date)
= Contains updated information.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your
le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in
this installation manual.
WARNING! Risk of Fire or Explosion!
Failure to install appliance according to these instructions could lead to
a
re or explosion.
ATTENTION INSTALLER:
Follow this Standard Work Checklist
Appliance Install Information
YES IF NO, WHY?
Veri
ed clearances to combustibles requirements are maintained. (Pg. 13-16) ___________________
Veri
ed that the chase is insulated and sealed. (Pg. 17)
___________________
Veri
ed mantel and wall clearance requirements are maintained. (Pg. 49-50) ___________________
Veri
ed hearth extension requirements are maintained. (Pg. 18) ___________________
Veri
ed appliance is leveled and secured. (Pg. 35) ___________________
Veri
ed required factory-supplied non-combustible board installed. (Pg. 36) ___________________
Venting/Chimney Section 7 (Pg. 37-40)
Veri
ed venting con
guration complies to vent diagrams.
___________________
Veri
ed venting installed, locked and sealed/secured in place.
___________________
Veri
ed venting meets clearance to combustible requirements. ___________________
Veri
ed wall/ceiling
restops are installed (if applicable).
___________________
Veri
ed attic insulation shield is installed (if applicable).
___________________
Veri
ed Exterior wall/Roof
ashing is installed and sealed.
___________________
Veri
ed termination cap is installed and sealed.
___________________
Electrical Section 8 (Pg. 41-43)
Veri
ed unswitched power (110-120 VAC) provided to the appliance.
____
_______________
Veri
ed wall switch wires are properly installed (if applicable).
___________________
Gas Section 9 (Pg. 44-45)
Veri
ed appliance is using proper fuel type.
___________________
If converted, veri
ed proper fuel conversion kit was used.
___________________
Veri
ed that gas components (
ttings, pressure taps, etc) are leak free and
replace is
operating under correct pressures. ___________________
Finishing Section 10 (Pg. 46-51)
Veri
ed that
nish material does not interfere with install/operation of decorative front. ___________________
Veri
ed combustible materials are not
installed in non-combustible areas.
___________________
Veri
ed all clearances meet installation manual requirements.
___________________
Veri
ed mantels/wall projections comply with installation manual requirements.
___________________
Appliance Setup Section 11 (Pg. 52-66)
Veri
ed all packaging and protective materials are removed (inside & outside of appliance). ___________________
Veri
ed refractory (
ber or glass) is installed properly. ___________________
Veri
ed Teco-Sil installed and properly fogged with black high temperature paint. ___________________
Veri
ed Lava Rock, Mystic Embers, Glowing Embers, and logs installed correctly. ___________________
Veri
ed
xed glass assembly installed and secured. ___________________
Veri
ed that a required decorative door option is installed properly. ___________________
Veri
ed remote control has been programmed and is fully functional. ___________________
Veri
ed proper air shutter setting for installation type and vent con
guration. ___________________
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation. ___________________
2461-982 12/16
Comments:
Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed ____________________________________________________________________________________