33
Heat & Glo • TRUE-36-IFT, TRUE-42-IFT, TRUE-50-IFT Installation Manual • 2461-980 Rev. Q • 11/20
E. Prepare for Heat Management
• Locate the heat management knockouts on the left and
right sides of the appliance. See Figure 5.5. Remove
one of the knockouts from the appliance with a tin snips.
• Center the duct collar around the exposed hole and
attach it to the appliance with 3 screws.
Note: Do this BEFORE final positioning of the appliance.
• Determine the location for the air register/fan housing
assembly.
Refer to the instructions shipped with the heat management
kit for the remaining installation steps.
KNOCKOUT LOCATION
LEFT AND RIGHT SIDES
Figure 5.5 Heat Management Knockout Cover Plate
Note:
Only one heat management system may be used
with this appliance and be controlled through the IFT remote
control. An additional heat management kit may be added,
however, it is recommended that it be wired through the
appliance junction box. Refer to the instructions shipped with
the heat management kit for more information.