Fig.49
2.
Pull off the pneumatic block (8).
3.
Change the 6 O-rings (42) of the base (5).
4.
Replace the O-ring (55).
®
The pneumatic block is removed.
®
Done
10.4
Installation
Ensure that the connection is firmly seated.
A tight fit of all connections is required for dust protection.
► Make sure that the connections are tightened to the defined torque.
Hint!
Assembly is done in reverse order.
Tighten the screws and connections as indicated in the table
No.
Designation
Tightening torque
Comments
6
Screw-in plug-in
connection
2.0 Nm
21
Sound absorber
2.0 Nm
22
Locking screw
0.5 Nm
23
Plug
--
24
Cable gland
2.5 Nm
Sealed opening to the
atmosphere
25
Screws, hood
2.0 Nm
Servicing
Installation
430BAL013985EN_6
94
25.04.2023
Содержание T.VIS E-20
Страница 6: ...430BAL013985EN_6 6 25 04 2023...
Страница 9: ...flowcomponents gea com www gea com General Information Contact 430BAL013985EN_6 25 04 2023 9...
Страница 84: ...Fig 42 X signal curve sensor Y current course curve LED brightness Start up 430BAL013985EN_6 84 25 04 2023...
Страница 108: ...14 Dimension sheet control top T VIS E 20 Fig 58 Dimension sheet control top T VIS E 20 430BAL013985EN_6 108 25 04 2023...
Страница 112: ......